THE PRIME MINISTER
----------

THE SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
--------------

No. 236/QD-TTg

Hanoi, February 14, 2007

 

DECISION

ON APPROVAL FOR MASTER PLAN FOR NGHI SON ECONOMIC ZONE DEVELOPMENT

THE PRIME MINISTER

Pursuant to the Law on Government organization dated December 25, 2001;

Pursuant to the Law on Construction dated November 26, 2003;

In consideration of requests in the Document No.06/TTr-BXD dated January 19, 2007 by the Minister of Construction and the Document No.4698/UBND dated November 06, 2006 by the People’s Committee of Thanh Hoa.

HEREBY DECIDES

Article 1. To approve the master plan for development of Nghi Son Economic Zone, Thanh Hoa province (hereinafter referred to as “Nghi Son EZ”) by the year 2015 as follows:

1. Scope

Nghi Son EZ with the total area of 18,611.8 ha covers 12 communes of Tinh Gia district, Thanh Hoa province. The boundary is defined as follows:

- Adjacent to Nguyen Binh and Binh Minh communes, Tinh Gia District, Thanh Hoa Province to the North.

- Adjacent to Quynh Luu district, Nghe An province to the South.

- Adjacent to China sea to the East.

- Adjacent to Nhu Thanh district, Thanh Hoa province to the West.

2. Characteristics:

- Nghi Son EZ is an integrated economic zone specializing in various fields and sectors such as industry – commerce - service – tourism – agro- forestry and fishery:

+ Key industries: oil refining, petrochemical industry and chemical industry;

+ Large-scale industries: steel industry, mechanics, automotive industry, shipbuilding, electricity, building materials, consumer goods, processing and exportation, and other industries and services in relation to Nghi Son deep-water ports.

- The Nghi Son EZ is a key urban- industry-tourism –service center of Thanh Hoa province and Nam Thanh – Bac Nghe zone.

3. Population projection:

- By 2015: Approximately 140,000 people

- By 2025: Approximately 200,000 people

4. Functional areas:

a) Non-tariff zones (approx. 500 ha)

b) Tariff zones (approx. 18,100 ha) including the following subzones:

- Residential subzones

+ In the East of the national highway 1A: define the boundary and scale of new urban complexes and existing residential areas for renovation, enhance technical infrastructures and invest in social infrastructure to meet the modern urban standards and remain standard distance from the oil refinery;

+ In the West of the national highway 1A: construct new urban complexes for relocation, site clearance, worker accommodation, rural areas, ecological tourist attractions and other functional sub-zones.

- Nghi Son port cluster: include dedicated ports for cement plants, oil refineries and petrochemical plants, and integrated ports and dedicated ports for the docking of vessels with the payload of 30,000 DWT and 10, 000DWT. The location and scale of such ports shall be determined according to the plans for Nghi Son EZ development and regional and international development.

- Industrial sub-zones

+ In the East of the national highway 1A: cover a total industrial land area of 2,050 ha including seaports (500 ha); petrol industry clusters (450 ha), Nghi Son 1 and Nghi Son 2 (300 ha); cement plants with the capacity of 4.3 million tonnage/year (110 ha), shipbuilding area (100 ha), thermal plants in the South (350 ha) and small-scale industry area (240ha);

+ In the West of the national highway 1A: cover an agricultural land with the area of 1,050 ha including Cong Thanh cement cluster with the capacity of 2.8 million tonnage per year ( approx. 50 ha); warehouses, areas for building material production and new industry in Truong Lam commune (1,000 ha).

- Resorts for health tourism, marine tourism, rural tourism and sightseeing tourist attractions.

- Ecological sub-zones including green parks, protection forests, coastal plants and landscape buffers.

- Functional sub-zones including shopping malls in bonded warehouse areas and urban complexes; and vocational schools.

c) Key technical infrastructures including existing technical infrastructures and expected infrastructures needing for The Nghi Son EZ development such as: Nghi Son deep-water ports, dedicated ports for cement plants and oil refineries and petrochemical plants, and integrated ports; civil airports, works for water and electricity supply, waste water treatment plants, solid waste treatment plants, etc. 

 5. Technical infrastructures planning:

The technical infrastructure shall be constructed according to the development objectives and standpoints to meet the population demands and ensure urban landscape, safety and environmental sanitation. To be specific:

a) Traffic systems

- External traffic systems:

+ Dedicated ports for cement plants and oil refineries and petrochemical plants, integrated ports and fishing ports shall be constructed in accordance with the port planning by the Ministry of Transport;

+ National roads and railways shall be constructed to connect The Nghi Son EZ with Ho Chi Minh highway. The civil airport shall be located in the South of Thanh Hoa province.

- Traffic systems in Nghi Son EZ:
the traffic network shall be completed in accordance with the approved planning for The Nghi Son EZ development; and waterways on Bach Lang river and trunk roads in the Economic Zone shall be studied.

b) Oil pipelines:

The location of oil pipelines shall be determined and shall satisfy technical requirements, fire, and explosive and environment safety under the regulations of laws.

c) Construction site preparation:

- Determine reasonable height clearance of construction areas.

- Study proposed measures against Acts of God; determine safety distance of coastal works.

- Select separate drainage systems and determine drainage basins.

d) Water supply: propose measures for protecting water in Yen My and Dong Chua lakes

dd) Electricity supply: use electricity from national grids, propose electrical lines and power stations according to the development period of the Economic zone.

e) Drainage and urban environmental sanitation:

- Propose the drainage and environmental sanitation measures for minimizing the environmental, soil and air pollution.

- Determine the location and scale of wastewater treatment plants and solid waste treatment plants, cemeteries and burial technologies; propose drainage networks and environmental protection measures.

- Propose modern technologies for solid waste treatment and industrial/municipal wastewater treatment on the basis of effectiveness according to natural terrain and landscape.

g) Telecommunication infrastructures: synchronize and modernize the infrastructures and ensure that it satisfies the international standards.

6. Planning documents:

Documents on the planning for The Nghi Son EZ development by 2025 shall be made in accordance with the Government’s Decree No.08/2005/ND-CP on construction dated January 24, 2005 and the Circular No.15/2005/TT-BXD guiding the formulation, assessment and approval for the construction planning dated August 19, 2005.

7. Progress:

- 02/2007: Approval for the master plan draft.

- From 02/2007 to 06/2007: Completion of assessment documents and reports

- 08/2007: Submission for approval for the final master plan.

Article 2. Implementation organizations

- Governing authority: Nghi Son EZ management board

- Planning-making authority: Nghi Son EZ management board

- Assessing authority: Ministry of Construction

- Applicants: Ministry of Construction and People’s Committee of Thanh Hoa province

- Approval authority: The Prime Minister

Article 3. The Nghi Son EZ management board and People’s Committee of Thanh Hoa shall:

- Formulate plans for The Nghi Son EZ development by the year 2025.

- Introduce the construction management regulations and carry out the construction of The Nghi Son EZ in accordance with the approved plan.

Article 4. This Decision enters into forces after 15 days from the date of its signature.

The Minister of Construction, Minister of Development and Planning, Minister of Finance, Minister of Commerce, Heads of Ministerial-level agencies, Heads of Governmental agencies, the President of the People’s Committee’s of Thanh Hoa province and relevant entities shall be responsible for the implementation of his Decision./.

 

 

PP. THE PRIME MINISTER
DEPUTY MINISTER




Nguyen Sinh Hung

 


------------------------------------------------------------------------------------------------------
This translation is made by LawSoft and for reference purposes only. Its copyright is owned by LawSoft and protected under Clause 2, Article 14 of the Law on Intellectual Property.Your comments are always welcomed

Đã xem:

Đánh giá:  
 

Thuộc tính Văn bản pháp luật 236/QD-TTg

Loại văn bảnQuyết định
Số hiệu236/QD-TTg
Cơ quan ban hành
Người ký
Ngày ban hành14/02/2007
Ngày hiệu lực01/03/2007
Ngày công báo...
Số công báo
Lĩnh vựcXây dựng - Đô thị
Tình trạng hiệu lựcCòn hiệu lực
Cập nhật16 năm trước
Yêu cầu cập nhật văn bản này

Download Văn bản pháp luật 236/QD-TTg

Lược đồ Decision 236/QD-TTg approval master plan for nghi son economic zone development


Văn bản bị sửa đổi, bổ sung

    Văn bản sửa đổi, bổ sung

      Văn bản bị đính chính

        Văn bản được hướng dẫn

          Văn bản đính chính

            Văn bản bị thay thế

              Văn bản hiện thời

              Decision 236/QD-TTg approval master plan for nghi son economic zone development
              Loại văn bảnQuyết định
              Số hiệu236/QD-TTg
              Cơ quan ban hànhThủ tướng Chính phủ
              Người kýNguyễn Sinh Hùng
              Ngày ban hành14/02/2007
              Ngày hiệu lực01/03/2007
              Ngày công báo...
              Số công báo
              Lĩnh vựcXây dựng - Đô thị
              Tình trạng hiệu lựcCòn hiệu lực
              Cập nhật16 năm trước

              Văn bản thay thế

                Văn bản được dẫn chiếu

                Văn bản hướng dẫn

                  Văn bản được hợp nhất

                    Văn bản hợp nhất

                      Văn bản gốc Decision 236/QD-TTg approval master plan for nghi son economic zone development

                      Lịch sử hiệu lực Decision 236/QD-TTg approval master plan for nghi son economic zone development

                      • 14/02/2007

                        Văn bản được ban hành

                        Trạng thái: Chưa có hiệu lực

                      • 01/03/2007

                        Văn bản có hiệu lực

                        Trạng thái: Có hiệu lực