Nội dung toàn văn Decision 3327/QD-BGTVT approval for detailed planning seaports southeast 2020 2014
MINISTRY OF TRANSPORT | SOCIALIST REPUBLIC OF VIETNAM |
No. 3327/QD-BGTVT | Hanoi, August 29, 2014 |
DECISION
APPROVAL FOR DETAILED PLANNING FOR SEAPORTS IN THE SOUTHEAST (GROUP 5) BY 2020 AND THE ORIENTATION TOWARDS 2030
MINISTER OF TRANSPORT
Pursuant to Maritime Code of Vietnam dated June 14, 2005;
Pursuant to the Law on Construction dated November 26, 2003;
Pursuant to the Government's Decree No. 107/2012/ND-CP dated December 20, 2012, defining the functions, tasks, entitlements and organizational structure of the Ministry of Transport;
Pursuant to the Government's Decree No. 92/2006/ND-CP dated September 07, 2006 on formulation, assessment, ratification, and management of socio-economic development master plans and the Government's Decree No. 04/2008/ND-CP dated January 11, 2008 on amendments to Decree No. 92/2006/ND-CP;
Pursuant to the Prime Minister’s Decision No. 1037/QD-TTg dated June 24, 2014 on amendments to Planning for development of Vietnam’s seaport system by 2020 and orientation towards 2030;
Pursuant to document No. 1178/TTg-KTN dated August 06, 2013 of the Prime Minister on improvement of management of Group 5 seaports and ports in Cai Mep – Thi Vai area;
In consideration of report No. 4634/TTr-CHHVN dated December 25, 2013 of Vietnam Maritime Administration;
At the request of Assessment Council and Director of Planning and Investment Department,
HEREBY DECIDES:
Article 1. Grant of approval for detailed planning for seaports in the Southeast (Group 5) by 2020 and the orientation towards 2030 with the following contents:
1. Viewpoint
- Make the best use of natural and socio-economic conditions of the region for port development; effectively use available land for port construction to improve the ability to receive large ships and develop potential for international transshipment of Group 5 seaports.
- Make the best use of available infrastructure of terminals and ports; make in-depth investment to improve capacity and meet demands for movement of goods carriage by sea in the Southeast and the South.
- Develop Group 5 seaports in association with connection of road, rail and inland waterway infrastructure to boost development of coastal economic zones, urban areas and major industrial parks in Ho Chi Minh City, Dong Nai, Ba Ria – Vung Tau, Binh Duong, Binh Phuoc and adjacent provinces.
- Combine harmonious development of dedicated ports for bulk cargo, liquid cargo, farm produce, etc. to serve movement of goods in the entire area.
- Provide land and water surface for development of multipurpose terminals, container ports, or dedicated ports serving the entire area.
- Enhance application of advanced technologies in management and operation of seaports, especially at major ports in Cai Mep – Thi Vai area (Ba Ria – Vung Tau), Cat Lai, Hiep Phuoc (Ho Chi Minh City).
- Expedite and associate relocation of ports in urban areas with traffic organization in seaport urban areas in a harmonious manner to avoid conflicting traffic connecting the port and urban areas.
- Utilize every social resource, especially from the private sector and foreign direct investment for development seaports and public infrastructure of seaports.
- Port development must be sustainable; seaport development shall be in association with environmental protection, ecology protection, and avoidance of negative impacts on social activities within the area. The development and operation of seaports in the area shall be in association with protection of the ecology of Ganh Rai bay, mangrove forests in Can Gio and along Thi Vai River; ensure that there are not negative impacts on tourism potential of Ho Chi Minh City and Vung Tau city.
- Seaport development shall be in association with national defense and security.
2. Development targets and orientation
a) General targets
- Reasonable arrange Group 5 seaports to develop potential, facilitate a balanced and uniform development of seaports and relevant infrastructure, combine development of industry and services as the motive for economic development and assurance of national defense and security.
- Relocate the ports along Sai Gon River and Ba Son shipyard to relieve the burden on the center of Ho Chi Minh City.
- Support the development of industrial parks and export-processing zones; facilitate urban area development to boost the industrialization and modernization process of the Southeast by 2020 with an orientation towards 2030.
- Establish and develop modern international ports and central ports to facilitate sea transport development of Vietnam and the world; attract part of transshipped goods in the region.
b) Specific targets
- Estimated quantity of goods movement at various times: 238,0 - 247,8 million tonnes by 2020; 294,1 - 316,4 million tonnes 2025; 358,5 to 411,5 million tonnes 2030, in which container cargo accounts for: 9,72 - 10,54 million TEU by 2020; 13,23 - 14,99 million TEU by 2025; 17,41 - 20,45 million TEU by 2030.
- Estimated quantity of tourists by sea through the ports at various times: 187400 – 271100 arrivals by 2020; 240000 - 437400 arrivals by 2025; 307400 - 705800 arrivals by 2030;
- Capacity of ships: general ships; bulk cargo ships with a deadweight tonnage of from 10.000 tonnes to over 100.000 tonnes, container ships with a deadweight tonnage of from 10.000 tonnes to over 100.000 tonnes, crude oil ships with a deadweight tonnage of up to 300.000 tonnes, oil product ships with a deadweight tonnage of 10.000 tonnes – 50.000 tonnes, passengers ships for the transport of up to 6.000 people.
3. Planning content
a) Detailed planning for Group 5 ports:
Group 5 has 04 seaports: Ho Chi Minh City Seaport, Dong Nai Seaport, Vung Tau Seaport (including Con Dao Port) and Binh Duong Seaport.
- Ho Chi Minh City Seaport: a national central multipurpose Terminal (Class I) which comprises terminals along Sai Gon river, Cat Lai terminals along Dong Nai river, terminals along Nha Be river, and Hiep Phuoc terminals along Soai Rap river.
Estimated capacity of goods movement: 115,7 - 116,3 million tonnes per year by 2020; 127,4 - 130,7 million tonnes per year by 2025; 144,1 - 156,3 million tonnes per year by 2030. Estimated capacity of container movement: 4,78 - 4,88 million TEU/year by 2015; 5,37 – 5.50 million TEU/year by 2020; 6.118- 6.487 million TEU/year by 2025; 7.336 – 8.092 million TEU/year by 2030.
Expected movement of international passengers by sea: 64500 - 93300 arrivals/year by 2020; 82600 - 150600 arrivals/year by 2025; 105900 - 243000 arrivals/year by 2030.
Detailed planning for primary terminals:
+ Terminals along Sai Gon river: 11 terminals/docks for ships with a deadweight tonnage of 20.000 – 30.000 tonnes. These terminals shall be relocated and repurposed in accordance with the Prime Minister’s Decision No. 791/QD-TTg dated August 12, 2005; part of the Khanh Hoi terminal shall be converted into an inland passenger terminal and maritime service center. Unrelocated wharves shall be upgraded, not expanded.
+ Cat Lai terminals (Dong Nai river): 09 terminals/docks for ships with a deadweight tonnage of up to 30.000 tonnes. These are currently the primary container terminals of Ho Chi Minh City Seaport.
+ Nha Be terminals (Nha Be river): 10 terminals/docks for ships with a deadweight tonnage of 20.000 – 30.000 tonnes. Terminals along Nha Be river shall be upgraded (not expanded) to serve ships with a deadweight tonnage of up to 30.000 tonnes. A new passenger terminal for ships with a capacity of 50.000 GRT shall be built in Phu Thuan (by Phu My bridge).
+ Hiep Phuoc terminals (Soai Rap river): primary terminals of Ho Chi Minh City Seaport in the future for general goods and containers of ships with a deadweight tonnage of 50.000 tonnes and container ships with a capacity of up to 4.000 TEU; some dedicated terminals for ships with a deadweight tonnage of 20.000 - 30.000 tonnes directly serving adjacent industrial facilities.
+ Can Giuoc – Long An terminals (on Soai Rap river): multipurpose terminals for ships with a deadweight tonnage of 20.000 – 50.000 tonnes and 70.000 tonnes partially loaded going through Soai Rap sanctuary, satellite terminals of central ports in Ho Chi Minh City area.
- Dong Nai Seaport: National and central multipurpose terminal (Class I ) which comprises: Long Binh Tan terminals (Dong Nai river); Phu Huu terminals (segments of Dong Nai river and Long Tau – Nha Be river), Ong Kep terminals (Long Tau and Dong Tranh rivers); Go Dau terminals and Phuoc An terminals (Thi Vai river).
Estimated capacity of goods movement: 19,7 - 21,0 million tonnes per year by 2020; 32,4 - 35,1 million tonnes per year by 2025; 51,5 - 58,5 million tonnes per year by 2030. Estimated capacity of container movement: 0,69 - 0,77 million TEU/year by 2020; 1,38 - 1,57 million TEU/year by 2025; 2,41 - 2,83 million TEU/year by 2030.
Detailed planning for primary terminals:
+ Phuoc An, Go Dau terminals (on Thi Vai river): primary terminals of Dong Nai Seaport for general ships and container ships with a deadweight tonnage of up to 60.000 tonnes (Phuoc An) and 30.000 tonnes (Go Dau); some dedicated terminals for ships with a deadweight tonnage of 6.500 - 12.000 tonnes directly serving adjacent industrial facilities.
+ Phu Huu, Nhon Trach, Ong Keo Terminals (Dong Nai, Nha Be, Long Tau rivers): dedicated terminals for ships with a deadweight tonnage of 10.000 – 30.000 tonnes and multipurpose terminals for ships with a deadweight tonnage of up to 30.000 tonnes serving factories and industrial facilities in the area.
+ Terminals along Dong Nai: terminals for general ships and ships carrying bulk cargo containers of up to 5.000 tonnes, dedicated terminals for ships with a deadweight tonnage of up to 1.000 tonnes in Long Binh Tan area (Dong Nai).
- Binh Duong Seaport: a local multipurpose terminal (Class II) along Dong Nai river which comprises 01 terminal for ships with a deadweight tonnage of up to 5.000 tonnes and container handling.
Estimated capacity of goods movement: 0,99 - 1,21 million tonnes per year by 2020 and remains unchanged during 2025 – 2030.
- Vung Tau Seaport: a national multipurpose terminal, international gateway (Class IA) which plays a role as an international transshipment port, comprising: Go Dau, Tac Ca Trung terminals; Phu My, My Xuan terminals; Cai Mep, Sao Mai – Ben Dinh terminals; Long Son terminals; Ding river terminals and Con Dao terminals.
Estimated capacity of goods movement: 101,6 - 109,2 million tonnes per year by 2020; 133,2 - 149,4 million tonnes per year by 2025; 161,8-195,5 million tonnes per year by 2030. Estimated capacity of container movement: 1,51 - 1,63 million TEU/year by 2015; 3,58 – 4,17 million TEU/year by 2020; 5,64 - 6,83 million TEU/year by 2025; 7,58 – 9,42 million TEU/year by 2030.
Expected movement of international passengers by sea: 122900 - 177700 arrivals/year by 2020; 157400 - 286800 arrivals/year by 2025; 201600 - 462800 arrivals/year by 2030.
Detailed planning for primary terminals:
+ Go Dau, Tac Ca Trung terminals: for general ships and container ships, capable of receiving ships with a deadweight tonnage of up to 30.000 tonnes.
+ Phu My, My Xuan terminals (Thi Vai river): for general ships with a deadweight tonnage of 50.000 – 80.000 tonnes; container ships with a capacity of up to 4.000 TEU. Shipping lanes shall be upgraded and expanded to receive ships with a deadweight tonnage of 60.000 – 120.000 tonnes (4.000 – 8.000 TEU) at Phu My and up to 60.000 tonnes at My Xuan; some terminals are dedicated to serving industrial and services facilities.
+ Cai Mep, Sao Mai – Ben Dinh terminals are primary terminals of the port which handle containers exported and imported of long shipping routes and international container transshipment. Cai Mep terminals are capable of receiving ships with a deadweight tonnage of 80.000 – 100.000 tonnes (6.000 – 8.000 TEU); shipping lanes shall be upgraded to receive ships with a deadweight tonnage of over 100.000 tonnes at Cai Mep. Sao Mai – Ben Dinh terminals area capable of receiving container ships with a deadweight tonnage of from 80.000 tonnes (6.000 TEU) to over 100.000 tonnes and international passenger ships with a capacity of up to 100.000 GRT.
+ Long Son terminals: dedicated to the oil refinery complex with terminals for receiving crude oil ships with a deadweight tonnage of 300.000 tonnes, ships with a deadweight tonnage of 30.000 – 50.000 tonnes carrying other materials and exports. The southeast coast is meant to build a multipurpose terminal serving long-term development of the area.
+ Vung Tau – Song Dinh terminals: capable of general ships with a deadweight tonnage of 10.000 tonnes (Dong Xuyen Industrial Park).
+ Con Dao terminals: general terminals and passenger terminals of Con Dao, capable of receiving ships with a deadweight tonnage of 2.000 - 5.000 tonnes. There are also maritime service terminals and oil terminals for ships with a deadweight tonnage of up to 10.000 tonnes.
b) Relocation plan:
Other terminals along Sai Gon river which are connected to Cat Lai, Thu Duc, Long Thanh, Vung Tau and Dong Nai industrial parks by Phu My bridge shall keep operating and might be relocated after 2020 if necessary.
(A list of capacity and functions of each port in the Group is provided in the Appendix enclosed with this Decision).
c) Plan for buoy wharves:
Buoy wharves on the shipping lanes are only temporary in areas where permanent terminals yet to be feasible. The construction of buoy wharves must be in association with development planning and appropriate for permanent terminals. When construction of a permanent terminal is completed, the investor in the buoy wharf shall relocate it to ensure safety and effective operation of the permanent terminal.
d) Plan for upgrade of shipping lanes:
- Sai Gon – Vung Tau lane: upgrade some sharp turns, maintain depth and maritime signaling system for ships with a deadweight tonnage of 30.000 tonnes; utilize tidal current both day and night.
- Soai Rap lane: dredged to the depth of -9,5 m, capable of ships with a deadweight tonnage of up to 30.000 tonnes fully loaded and 50.000 tonnes partially loaded. In the next period: monitor developments and assess the dredging result (-9.5 m) to consider dredging to serve ships with a deadweight tonnage of up to 50.000 tonnes fully loaded and over 50.000 tonnes partially loaded.
- Dong Nai lane: Maintain operation of the 36-km segment from Mui Den Do junction to Dong Nai Port.
- Cai Mep – Thi Vai channel: Determine the largest size of ships able to enter the terminals; estimate sizes of ships for each terminal group: Cai Mep terminals for ships with a deadweight tonnage of 80.000 – >100.000 tonnes, container ships with a deadweight tonnage of 6.000 – 8.000 TEU; Phu My (Thi Vai) terminals for ships with a deadweight tonnage of 60.000 – 100.000 tonnes, container ships with a deadweight tonnage of 4.000 - 8.000 TEU ships; Phuoc An, My Xuan terminals for ships with a deadweight tonnage of up to 60.000 tonnes; Go Dau terminals for ships with a deadweight tonnage of up to 30.00 tonnes.
- Ding river lane: Maintain conditions for operation of ships with a deadweight tonnage of 10.00 tonnes.
dd) Projects given priority by 2020
- Cai Mep – Thi Vai lane: complete comprehensive study into Cai Mep – Thi Vai lane as the basis for preparing investment plans, etc. to attract shippers to Cai Mep – Thi Vai area.
- Soai Rap lane: assess the stability of -9.5m depth lane, consider dredging for ships with a deadweight tonnage of 50.000 tonnes and over 50.000 tonnes partially loaded (reduced load, utilizing tidal current) to enter Hiep Phuoc terminals.
- Invest in terminals dedicated to oil refinery at Long Son: import of crude oil, export of oil products, import of materials
- Port-connecting roads:
+ Highway 51 (Dong Nai – Ba Ria Vung Tau): complete upgrading Highway 51 connecting Cai Mep – Thi Vai terminal system and the local traffic network.
+ Inter-port Cai Mep - Thi Vai road (Ba Ria - Vung Tau): expedite construction of the road after SP-PSA International Port, Thi Vai International Port and Ba Son Shipyard in Phu My.
+ Invest in construction of Road 991B and Phuoc Hoa – Cai Mep road to connect Cai Mep – Thi Vai terminals and Cai Mep Ha Logistics Center.
+ Roads to Hiep Phuoc terminals: finish North – South roads to Hiep Phuoc terminals and main roads to terminals of the industrial park, especially Road D3 to Sai Gon Hiep Phuoc terminal.
4. Policies, mechanism, and solutions
a) Regarding general port development
- Enhance private sector involvement in development of seaport infrastructure. Enhance investment promotion, encourage and enable all domestic and foreign economic sectors to invest in seaport development; state budget shall focus on investment in public infrastructure works (shipping lanes, common breakwaters) connected to important seaports.
- Keep boosting administrative procedure reform in management of investment and port operation towards simplification and international integration. Improve office of port authorities and regulatory bodies at new terminals to ensure timely state management of them. Improve state management of planning for development of seaports in the Group; ensure cooperation and harmony with planning for development of local traffic network, construction planning, and socio-economic development master plans of the areas where the ports are located.
- Encourage construction of common terminals at economic zones and industrial parks to improve effectiveness of investment and use of coastlines. Ensure at least 500 – 700 m in width of land for port development along big rivers with potential for port development (Cai Mep - Thi Vai, Soai Rap, Long Tau, Nha Be, Dong Nai, etc.). Provide land area behind the ports to build goods distribution centers which plan the role as logistics centers.
b) Policies on and organization of port relocation
- Policies on and organization of relocation of ports along Sai Gon river and Ba Son shipyard are specified in the Prime Minister’s Decision No. 791/QD-TTg dated August 12, 2005 and other directive documents.
- Financial policies: specified in the Prime Minister’s Decision No. 74/2005/QD-TTg dated April 06, 2005 on use of revenues from transfer of land use right, liquidation of factories and other works upon relocation of business organizations and factories under planning; the Prime Minister’s Decision No. 46/2010/QD-TTg dated April 24, 2010 of the Prime Minister promulgating Financial policies on relocation of ports along Sai Gon river and Ba Son shipyard and relevant legal documents.
- Other policies on relocation may be reported to the Steering Committee for relocation of ports along Sai Gon river and Ba Son shipyard; ultra vires issues may be reported to the Prime Minister.
c) Mechanism for encouragement of international transit of goods
- Enhance application of policies encouraging development of international transit of goods and establishment of basic infrastructure, organize the management, operation, provision of financial and banking services and other services necessary for improvement of competitiveness, attraction and movement of internationally transited goods in the region.
- Encourage and expedite construction of logistics centers in Cai Mep Ha area.
Article 2. Management and organization of planning implementation
1. Vietnam Maritime Administration
- Cooperate with People’s Committees of provinces and relevant agencies in publishing and managing implementation of approved planning, especially for new construction of wharves and terminals in their provinces, ensure that construction of new wharves and terminals does not exceed the need for goods movement under approved planning; propose adjustments and updates to planning for ports and terminals to the Ministry of Transport.
- Annually cooperate with local governments and relevant organizations in assessing the implementation of port development planning; propose actions against projects that fail to comply with the planning to the Ministry of Transport.
- Organize the implementation of seaport development planning in association with implementation of solutions for improve effectiveness of seaports and terminals specified in Decision No. 3304/QD-BGTVT dated October 25, 2013 of the Minister of Transport.
2. Ministries, professional regulatory bodies and the People’s Committees of provinces
- Ministries, professional regulatory bodies and the People’s Committees of provinces shall instruct investors to plan projects for construction, renovation and upgrade of seaports and shipping lanes in accordance with approved planning and regulations of law on construction.
- Ministries, professional regulatory bodies and the People’s Committees of provinces shall instruct competent authorities to propose addition of terminals to the planning to Vietnam Maritime Administration; Vietnam Maritime Administration shall submit reports to the Ministry of Transport for consideration.
- The People’s Committees of provinces, pursuant to approved planning, shall strictly manage and properly use land area dedicated to port construction; provide land area for harmonious development of ports and infrastructure connected thereto, logistics centers and maritime service centers in order to ensure smooth operation of seaports; cooperate with the Ministry of Transport in organizing the transport system in a manner that avoids conflicting traffic between the ports and urban areas; reach an agreement the Ministry of Transport in the scale and progress of port construction projects before allocating land or issuing a certificate of investment to a seaport terminal construction project.
Article 3. This Decision comes into force from the day on which it is signed and replaces Decision No. 1745/QD-BGTVT dated August 03, 2011 of the Minister of Transport.
Article 4. Chief of Office, Chief Inspector of the Ministry of Transport, Directors of Departments, Director of Vietnam Maritime Administration, heads of agencies, relevant organizations and individuals are responsible for the implementation of this Decision./.
| MINISTER |
APPENDIX
LIST OF PORTS AND TERMINALS IN THE SOUTHEAST (GROUP 5) BY 2020 AND ORIENTATION TOWARDS 2030
(Enclosed with Decision No. 3327/QD-BGTVT dated August 29, 2014 of the Minister of Transport)
A. HO CHI MINH CITY SEAPORT
No. | Name | Condition | Class | Estimation (Planning) | Note | |||||||||||||
Quantity (pcs)/Total length (m) of wharves | Size of ship | Area (hectares) | By 2020 | By 2025 | By 2030 | |||||||||||||
Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | |||||||
1 | TERMINALS ALONG SAIGON RIVER | 52 / 8673 | 5.000 - 30.000 | 210,97 |
| 23,48 | 30.000 | 25 / 4198 | 128,76 | 23,48 | 30.000 | 25 / 4198 | 118,76 | 23,48 | 30.000 | 25 / 4198 | 128,76 |
|
1 | Terminals of Ba Son Shipyard | 6 / 754 | 6.000 -10.000 | 26,40 | Dedicated to shipbuilding and ship repair |
|
|
|
|
|
|
|
|
|
|
|
| To be relocated |
2 | Sai Gon Terminal | 15 / 2.745 | 10.000 - 30.000 | 45,83 | Multipurpose terminal | 5,25 | 10.000 -30.000 | 5 / 995 | 20,52 | 5,25 | 10.000 -30.000 | 5 / 995 | 20,52 | 5,25 | 10.000 -30.000 | 5 / 995 | 20,52 |
|
- | Nha Rong + Khanh Hoi terminals | 10 / 1.750 | 10.000 -30.000 | 25,31 | Multipurpose terminal |
|
|
|
|
|
|
|
|
|
|
|
| To be repurposed |
- | Other terminals | 5 / 995 | 10.000 -30.000 | 20,52 | Multipurpose terminal | 5,25 | 10.000 -30.000 | 5 / 995 | 20,52 | 5,25 | 10.000 -30.000 | 5 / 995 | 20,52 | 5,25 | 10.000 -30.000 | 5 / 995 | 20,52 |
|
3 | Tan Thuan Dong Terminal | 1 / 149 | 15.000 | 2,95 | Multipurpose terminal |
|
|
|
|
|
|
|
|
|
|
|
| To be relocated |
4 | Ben Nghe Terminal | 4 / 816 | 10.000 -30.000 | 32,00 | Multipurpose terminal | 4,70 | 10.000 -30.000 | 4 / 816 | 32,00 | 4,70 | 10.000 -30.000 | 4 / 816 | 32,00 | 4,70 | 10.000 -30,000 | 4 / 816 | 32,00 |
|
5 | VICT Terminal | 4 / 678 | 15.000- 20.000 | 28,26 | Container terminal | 6,05 | 15.000- 20.000 | 4 / 678 | 28,26 | 6,05 | 15.000- 20.000 | 4 / 678 | 28,26 | 6,05 | 15.000 -20.000 | 4 / 678 | 28,26 |
|
6 | ELF Gas Sai Gon Terminal | 1 / 26 | 3.000 | 2,00 | Gas terminal | 0,10 | 3.000 | 1 / 26 | 2,00 | 0,10 | 3.000 | 1 / 26 | 2,00 | 0,10 | 3.000 | 1 / 26 | 2,00 |
|
7 | Bien Dong Terminal | 2 / 140 | 5.000 | 3,10 | Multipurpose terminal | 0,35 | 5.000 | 2 / 140 | 3,10 | 0,35 | 5.000 | 2 / 140 | 3,10 | 0,35 | 5,000 | 2 / 140 | 3,10 |
|
8 | Terminals of Sai Gon Shipyard | 1 / 123 | 10.000 | 11,36 | Dedicated to shipbuilding and ship repair | 0,25 | 10,000 | 2 / 273 | 11,36 | 0,25 | 10.000 | 2 / 273 | 11,36 | 0,25 | 10.000 | 2 / 273 | 11,36 |
|
9 | Rau Qua Terminal (Vegetable Terminal) | 1 / 222 | 20.000 | 7,24 | Multipurpose terminal |
|
|
|
|
|
|
|
|
|
|
|
| To be repurposed |
10 | Bong Sen Terminal | 2 / 275 | 30.000 | 6,00 | Multipurpose terminal | 1,53 | 30.000 | 2 / 275 | 11,00 | 1,53 | 30.000 | 2 / 275 | 11,00 | 1,53 | 30.000 | 2 / 275 | 11,00 |
|
II | TERMINALS ALONG DONG NAI RIVER | 20 / 3.848 | 30.000 | 185,33 |
| 59,26 | 30.000 | 23 / 4.578 | 238,56 | 59,26 | 30.000 | 23 / 4.578 | 238,56 | 67,71 | 30.000 | 26 / 5.078 | 274,56 |
|
1 | ITC Phu Huu International Terminal | 4 / 900 | 30.000 | 36,57 | Multipurpose terminal | 6,14 | 30.000 | 4 / 900 | 36,57 | 6,14 | 30.000 | 4 / 900 | 36,57 | 6,14 | 30.000 | 4 / 900 | 36,57 |
|
2 | Terminal of Ha Tien 1 Cement JSC | 1 / 205 | 20.000 |
| Cement terminal | 3,42 | 20.000 | 1 / 205 | 23,23 | 3,42 | 20.000 | 1 / 205 | 23.23 | 3,42 | 20.000 | 1 / 205 | 23,23 |
|
3 | Phu Huu Terminal | 2 / 320 | 30.000 | 24,00 | Multipurpose terminal | 6,50 | 30.000 | 3 / 550 | 24,00 | 6,50 | 30.000 | 3 / 550 | 24,00 | 6.50 | 30.000 | 3 / 550 | 24,00 |
|
4 | Tan Cang Cat Lat Terminal | 7 / 1.462 | 30.000 | 76,05 | For container | 36,30 | 30,000 | 7 / 1.462 | 76,05 | 36,30 | 30.000 | 7 / 1.462 | 76,05 | 36,30 | 30,000 | 7 / 1.462 | 76,05 |
|
5 | Sai Gon Shipyard Terminal | 3 / 256 | 5.000 | 9,71 | Dedicated to shipbuilding and ship repair | 0,50 | 5.000 | 3 / 256 | 9,71 | 0,50 | 5,000 | 3 / 256 | 9,71 | 0,50 | 5.000 | 3 / 256 | 9,71 |
|
6 | Sai Gon Petro Terminal | 2 / 500 | 25.000 -32.000 | 26,00 | Oil terminal | 1,70 | 25.000 -32.000 | 2 / 500 | 26,00 | 1,70 | 25.000 -32.000 | 2 / 500 | 26,00 | 1.70 | 25.000 -32.000 | 2 / 500 | 26,00 |
|
7 | Holcim Vietnam Terminal | 1 / 205 | 20.000 | 13,00 | Cement terminal | 2,20 | 20.000 | 1 / 205 | 13,00 | 2,20 | 20.000 | 1 / 205 | 13,00 | 2,20 | 20.000 | 1 / 205 | 13,00 |
|
8 | Terminal of Cat Lai Industrial Park |
|
|
| Multipurpose terminal | 2,50 | 20.000 | 2 / 500 | 30,00 | 2,50 | 20.000 | 2 / 500 | 30,00 | 10,95 | 20.000 | 5 / 1.000 | 66,00 |
|
III | TERMINALS ALONG NHA BE RIVER | 20 / 1.876 | 30.000 | 134,12 |
| 21,6 | 30.000 DWT | 21 / 2.451 | 149,11 | 23,2 | 30.000 DWT | 23 / 3,151 | 165,47 | 243 | 30.000 DWT | 24 / 3.601 | 165,47 |
|
1 | Phu Thuan Passenger Terminal |
|
|
| International passenger terminal |
| 50.000 -60.0000 GRT | 1 / 300 | 4,60 |
| 50.000 -60.0000 GRT | 2 / 600 | 4,60 |
| 50.000 - 60.0000 GRT | 2 / 600 | 4,60 | To be developed within bridge clearance |
2 | Navioil Terminal | 1 / 174 | 10,000 | 15,80 | Dedicated terminal | 1,20 | 10.000 | 1 / 174 | 15,80 | 1,20 | 10.000 | 1 / 174 | 15,80 | 1,20 | 10.000 | 1 / 174 | 15,80 |
|
3 | Shipmarine Shipyard Terminal | 1 / 100 | 6.500 | 6,00 | Dedicated to shipbuilding and ship repair | 0,20 | 6.500 | 1 / 100 | 6,00 | 0,20 | 6.500 | 1 / 100 | 6,00 | 0,20 | 6.500 | 1 / 100 | 6,00 |
|
4 | An Phu Shipyard Terminal | 1 / 50 | 5.000 | 5,00 | Dedicated to shipbuilding and ship repair | 0,10 | 5.000 | 1 / 50 | 5,00 | 0,10 | 5.000 | 1 / 50 | 5,00 | 0,10 | 5.000 | 1 / 50 | 5,00 |
|
5 | Terminal of Waterways College II | 1/ 27 | 300 | 1,97 | Dedicated terminal |
| 300 | 1 / 27 | 1,97 |
| 300 | 1 / 27 | 1,97 |
| 300 | 1 / 27 | 1,97 |
|
6 | Minh Tan Oil terminal | 1 / 30 | 1.000 |
| Oil terminal | 0,10 | 1.000 | 1 / 30 |
| 0,10 | 1.000 | 1 / 30 |
| 0,10 | 1.000 | 1 / 30 |
|
|
7 | Nha Be Multipurpose Terminal |
|
|
| Multipurpose and dedicated terminal |
|
|
|
| 1,60 | 30.000 | 1 / 400 | 16,36 | 3,20 | 30.000 | 2 / 850 | 16,36 |
|
8 | Nha Be Central Oil terminal | 8 / 740 | 25.000 -30.000 | 94,00 | Oil terminal | 12,00 | 25.000 -30.000 | 8 / 740 | 94,00 | 12,00 | 25.000- 30.000 | 8 / 740 | 94,00 | 12,00 | 25.00030.000 | 8 / 740 | 94,00 |
|
9 | PV OIL Terminal | 2 / 54 | 25.000 |
| Oil terminal | 0,50 |
|
|
| 0,50 |
|
|
| 0,50 |
|
|
|
|
10 | Petechim Terminal | 2 / 325 | 5.000-25.000 | 8,90 | Oil terminal | 4,50 | 5.000 - 25.000 | 2 / 325 | 8,90 | 4,50 | 5.000 - 25.000 | 2 / 325 | 8,90 | 4,50 | 5.000 - 25.000 | 2 / 325 | 8,90 |
|
11 | VK 102 Terminal | 1 / 196 | 10.000 |
| Oil terminal | 1,2 | 40.000 | 1 / 250 |
| 1,2 | 40.000 | 1 / 250 |
| 1,2 | 40.000 | 1 / 250 |
|
|
Thanh Le Terminal |
|
|
| 0,9 | 4.000 | 1 / 87 |
| 0,9 | 4.000 | 1 / 87 |
| 0,9 | 4.000 | 1 / 87 |
|
| ||
12 | Oil terminal of Lam Tai Chinh Ltd. | 1 / 60 | 15.000 | 2,45 | Oil terminal | 0,90 | 15.000 | 1 / 60 | 2,45 | 0,90 | 15.000 | 1 / 60 | 2,45 | 0,90 | 15.000 | 1 / 60 | 2,45 |
|
13 | Aviation Oil terminal (Hang Khong Oil terminal) |
|
|
| Oil terminal |
| 15.000 | 1 / 188 | 10,39 |
| 15.000 | 1 / 188 | 10,39 |
| 15.000 | 1 / 188 | 10,39 |
|
14 | Terminal of Shipyard X51 | 1 / 120 | 10.000 |
| Dedicated to shipbuilding and ship repair |
| 10.000 | 1 / 120 |
| 10.000 | 1 / 120 |
| 0,00 | 10.000 | 1 / 120 |
|
|
|
IV | TERMINALS ALONG SOAI RAP RIVER | 12 / 2307 | 30.040 | 158,81 |
| 36,26 | 30.000 -80.000 | 20 / 4.527 | 256,21 | 55,96 | 30.000 -80.000 | 28 / 5.857 | 333,8 | 62,46 | 30.000 -80.000 | 31 / 6.511 | 375,3 |
|
1 | Multipurpose Terminal |
|
|
| Multipurpose terminal |
|
|
|
| 2,15 | 30.000 | 1 / -- | 9,18 | 2,15 | 30.000 | 1 / -- | 9,18 | Suitable for Binh Khanh bridge |
2 | Terminal of Cotec Cement Grinding Station | 1 / 70 | 15.000 | 3,70 | Cement terminal | 0,50 | 15.000 | 1 / 70 | 3,70 | 0,50 | 15.000 | 1 / 70 | 3,70 | 0,50 | 15.000 | 1 / 70 | 3,70 |
|
3 | Terminal of Thang Long Cement Grinding Station | 1 / 179 | 15.000 | 10,26 | Cement terminal | 1,41 | 15.000 | 1 / 179 | 10,26 | 1,41 | 15.000 | 1 / 179 | 10,26 | 1,41 | 15.000 | 1 / 179 | 10,26 |
|
4 | Terminal of Fico Cement Grinding Station | 1 / 200 | 20.000 | 10,26 | Cement terminal | 1,50 | 20.000 | 1 / 200 | 10,26 | 1,50 | 20.000 | 1 / 200 | 10,26 | 1,50 | 20.000 | 1 / 200 | 10,26 |
|
5 | Terminal of Chifon Cement Grinding Station | 1 / 179 | 20.000 | 11,33 | Cement terminal | 1,20 | 20.000 | 1 / 179 | 11,33 | 1,20 | 20.000 | 1 / 179 | 11,33 | 1,20 | 20.000 | 1 / 179 | 11,33 |
|
6 | Tan Cang Hiep Phuoc Terminal | / |
|
| Multipurpose terminal | 3,20 | 50.000 | 2 / 420 | 15,40 | 3,20 | 50.000 | 2 / 420 | 15,40 | 3,20 | 50.000 | 2 / 420 | 15,40 |
|
7 | Terminal of Hiep Phuoc Power Plant | 1 / 300 | 30.000 | 45,50 | Oil terminal | 0,53 | 30.000 | 1 / 300 | 45,50 | 0,53 | 30.000 | 1 / 300 | 45,50 | 0,53 | 30.000 | 1 / 300 | 45,50 |
|
8 | Nghi Son Cement terminal | 1 / 204 | 20.000 | 7,90 | Cement terminal | 0,89 | 20.000 | 1 / 204 | 7,90 | 0,89 | 20.000 | 1 / 204 | 7,90 | 0,89 | 20.000 | 1 / 204 | 7,90 |
|
9 | Saigon Premier Container Terminal | 2 / 500 | 30.000 | 23,00 | Container terminal | 8,80 | 50.000 | 2 / 500 | 40,00 | 16,50 | 50.000 | 4 / 950 | 40,00 | 16,50 | 50.000 | 4 / 950 | 40,00 |
|
10 | Calofic Terminal | 1 / 159 | 20.000 |
| Dedicated terminal | 0,20 | 20.000 | 1 / 159 |
| 0,20 | 20.000 | 1 / 159 |
| 0,20 | 20.000 | 1 / 159 |
|
|
11 | Terminal of Tico Detergent Factory | 1 / 146 | 10.000- 15.000 |
| Oil terminal | 0,80 | 10.000- 15.000 | 1 / 146 | 3,00 | 0,80 | 10.000- 15.000 | 1 / 146 | 3,00 | 0,80 | 10,000- 15.000 | 1 / 146 | 3,00 |
|
12 | Terminal of Ha Long Cement Grinding Station | 1 / 170 | 15.000 | 10,80 | Cement terminal | 1,41 | 15.000 | 1 / 170 | 10,80 | 1,41 | 15.000 | 1 / 170 | 10,80 | 1,41 | 15.000 | 1 / 170 | 10,80 |
|
13 | Multipurpose Terminal |
|
|
| Multipurpose terminal |
|
|
|
| 1.60 | 30.000- 50.000 | 2 / 320 | 11,60 | 1,60 | 30,000- 50.000 | 2 / 320 | 11,60 |
|
14 | Multipurpose terminal (Tan Thuan Dong terminal is to be relocated) |
|
|
| Multipurpose terminal | 1,00 | 30.000- 50.000 | 1 / 200 | 12,00 | 1.00 | 30.000- 50.000 | 1 / 200 | 12,00 | 3,75 | 30.000- 50.000 | 2 / 354 | 23.50 |
|
15 | Sai Gon - Hiep Phuoc Terminal | 1 / 200 | 50.000 | 36,06 | Multipurpose terminal | 9,82 | 50.000 | 3 / 800 | 36,06 | 9,82 | 50.000 | 3 / 800 | 36,06 | 9,82 | 50.000 | 3 / 800 | 36,06 |
|
16 | Sai Gon Hiep Phuoc Logistics Center |
|
|
| Multipurpose terminal |
|
|
|
|
| 1.000-3.000 | 1 / 60 | 16,81 |
| 1.000-3.000 | 1 / 60 | 16,81 |
|
17 | Hiep Phuoc Downstream Zone |
|
|
| Multipurpose terminal | 5,00 | 30.000-50.000 | 3 / 1.000 | 50,00 | 13,25 | 30.000-80.000 | 5 / 1.500 | 90,00 | 17,00 | 30.000-80.000 | 7 / 2.000 | 120,0 |
|
V | TERMINALS ALONG SOAI RAP RIVER IN LONG AN PROVINCE | 1 / 205 | 20.000 | 26 |
| 5,9 | 10.000- 75.000 | 3 / 663 | 96 | 18,45 | 10.000- 75.000 | 7 / 1.353 | 216,73 | 24,8 | 10.000- 75.000 | 12 / 2.603 | 301,7 |
|
1 | Potential terminals downstream of Chim Tren channel (Long An) |
|
|
| Multipurpose terminal |
|
|
|
|
|
|
|
|
|
|
|
| Potential terminal |
2 | VinaBenny Energy Terminal |
|
|
| Oil terminal | 3,00 | 10.000-75.000 | 1 / 290 | 60,00 | 6,00 | 10.000- 75.000 | 3 / 560 | 120,00 | 6,00 | 10.000-75.000 | 3 / 560 | 120,00 |
|
3 | Long An International Terminal |
|
|
| Multipurpose terminal |
|
|
|
| 9,55 | 30.000-50.000 | 2 / 420 | 60,73 | 15,90 | 30.000-50.000 | 7 / 1.670 | 145,70 |
|
4 | Luks Cement Terminal |
|
|
| Cement terminal | 1,40 | 20.000 | 1 / 168 | 10,00 | 1,40 | 20.000 | 1 / 168 | 10,00 | 1,40 | 20.000 | 1 / 168 | 10,00 |
|
5 | Phuc Son Cement Terminal | 1 / 205 | 20.000 | 26,00 | Cement terminal | 1,50 | 20.000 | 1 / 205 | 26,00 | 1,50 | 20.000 | 1 / 205 | 26,00 | 1,50 | 20.000 | 1 / 205 | 26,00 |
|
6 | Terminal upstream of Cat channel |
|
|
| Multipurpose terminal |
|
|
|
|
|
|
|
|
|
|
|
| Potential |
| TOTAL | 105 / 16.909 |
| 715,23 |
| 146,5 |
| 92 / 16.417 | 868,64 | 180,35 |
| 106 / 19.137 | 1.083 | 203,25 |
| 113 /21.991 | 1.246 |
|
Note: Schedule for investment in the terminals varies according to estimated need for goods movement.
B. DONG NAI SEAPORT
No. | Name | Condition | Class | Estimation (Planning) | Note | |||||||||||||
Quantity (pcs)/Total length (m) of wharves | Size of ship | Area (hectares) | By 2020 | By 2025 | By 2030 | |||||||||||||
Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | |||||||
I | TERMINALS ALONG DONG NAI RIVER | 5 / 592 | 5.000 | 15,82 |
| 736 | 5.000 - 30.000 | 8 / 1.232 | 48,92 | 19,79 | 5.000 -30.000 | 15 / 2.862 | 147,62 | 28,39 | 5.000 - 30.000 | 19 / 3.662 | 199,86 |
|
1 | Dong Nai Terminal | 3 / 170 | 2.000 - 5.000 | 8,33 | Multipurpose terminal | 2,80 | 5,000 | 5 / 460 | 17,13 | 2,80 | 5.000 | 5 / 460 | 17,13 | 2,80 | 5.000 | 5 / 460 | 17,13 |
|
2 | SCT Gas Vietnam Terminal | 1 / 302 | 1.000 | 3,00 | Gas terminal | 0,03 | 1.000 | 1 / 302 | 3,00 | 0,03 | 1.000 | 1 / 302 | 3,00 | 0,03 | 1.000 | 1 / 302 | 3,00 |
|
3 | VT Gas Terminal | 1 / 120 | 1.000 | 4,49 | Oil terminal | 0,13 | 1,000 | 1 / 120 | 4,49 | 0,21 | 1.000 | 2 / 200 | 4,49 | 0,21 | 1.000 | 2 / 200 | 4,49 |
|
4 | Viet Thuan Thanh Multipurpose Terminal |
|
|
| Multipurpose, container terminal | 4,40 | 30.000 | 1 / 350 | 24,30 | 7,15 | 30.000 | 2 / 600 | 35,00 | 12,50 | 30.000 | 5 / 1.100 | 69,24 |
|
5 | Phu Huu Multipurpose Terminal (Terminal 1) |
|
|
| Multipurpose terminal |
|
|
|
| 3,25 | 30,000 | 1 / 300 | 17,00 | 3,25 | 30.000 | 1 / 300 | 17,00 |
|
6 | Phu Huu Multipurpose Terminal (Terminal 2) |
|
|
| Multipurpose terminal |
|
|
|
| 1,60 | 30.000 | 1 / 300 | 16,50 | 1,60 | 30.000 | 1 / 300 | 16,50 |
|
7 | Phu Huu Multipurpose Terminal (Terminal 3) |
|
|
| Multipurpose terminal |
|
|
|
|
|
|
|
| 3,25 | 30.000 | 1 / 300 | 18,00 |
|
8 | Phu Huu Multipurpose Terminal (Terminal 4 – Tin Nghia Terminal) |
|
|
| Multipurpose terminal |
|
|
|
| 3,25 | 30.000 | 1 / 300 | 20,00 | 3,25 | 30.000 | 1 / 300 | 20,00 |
|
9 | Tin Nghia Oil terminal |
|
|
| Oil terminal |
|
|
|
| 1,50 | 30.000 | 2 / 400 | 34,50 | 1,50 | 30.000 | 2 / 400 | 34,50 |
|
II | TERMINALS ALONG NHA BE RIVER | 2 / 366 | 25.000 | 22,30 |
| 4,35 | 30.000 | 5 / 846 | 70,82 | 8,35 | 30.000 | 9 / 1.896 | 134,82 | 14,25 | 30.000 | 13 / 3.106 | 203,32 |
|
1 | Minh Tan Oil Terminal |
|
|
| Oil terminal | 1,50 | 30.000 | 2 / 400 | 30,52 | 1,50 | 30.000 | 2 / 400 | 30,52 | 1,50 | 30.000 | 2 / 400 | 30,52 |
|
2 | Phu Huu – Duc Tai Thinh Multipurpose Terminal |
|
|
| Multipurpose terminal | 0,00 |
|
|
| 0,00 |
|
|
| 1,20 | 30.000 | 1 / 350 | 21,00 |
|
3 | Oil Terminal of Logistics Administration (Tổng Cục Hậu Cần) |
|
|
| Oil terminal | 0,00 |
|
|
| 2,00 | 30,000 | 2 / 500 | 25,00 | 2,00 | 30.000 | 2 / 500 | 25,00 |
|
4 | Oil Terminals of Vinalines |
|
|
| Oil terminal | 0,00 |
|
|
| 0,00 |
|
|
| 2,00 | 30.000 | 2 / 500 | 25,00 |
|
5 | Phu Huu Multipurpose Terminal (Terminal 6 – Phu Thien Phat Terminal) |
|
|
| Multipurpose terminal | 0,00 |
|
|
| 2,00 | 30.000 | 2 / 550 | 39,00 | 2,00 | 30.000 | 2 / 550 | 39,00 |
|
6 | Vinh Hung Terminal |
|
|
| Dedicated/Multipurpose terminal |
|
|
|
| 2,70 | 30.000 | 1 / 360 | 22,50 | 2,70 | 30.000 | 1 / 360 | 22,50 |
|
7 | Phu Dong Timber Terminal | 1 / 146 | 25.000 | 9,30 | For timber | 0,30 | 25.000 | 1 / 146 | 9,30 | 0,30 | 25.000 | 1 / 146 | 9,30 | 0,30 | 25.000 | 1 / 146 | 9,30 |
|
8 | Comeco Oil Terminal |
|
|
| Oil terminal | 0,95 | 25.000 | 1 / 80 | 18,00 | 0,95 | 25.000 | 1 / 80 | 18,00 | 0,95 | 25.000 | 1 / 80 | 18,00 |
|
9 | Phuoc Khanh Oil Terminal | 1 / 220 | 25.000 | 13,00 | Oil terminal | 1,60 | 25.000 | 1 / 220 | 13,00 | 1,60 | 25.000 | 1 / 220 | 13,00 | 1,60 | 25.000 | 1 / 220 | 13,00 |
|
III | TERMINALS ALONG LONG TAU RIVER | 5 / 976 | 30.000 | 39,65 |
| 3,40 | 30.000 | 9 / 1.938 | 138,52 | 6,60 | 30.000 | 11 / 2.933 | 196,08 | 18,80 | 30.000 | 18 / 4.472 | 360,01 |
|
1 | Terminal of Shipyard 76 |
|
|
| Dedicated to shipbuilding and ship repair | 0,00 |
|
|
| 0,00 |
|
|
| 0,00 |
|
|
| To be invested in when appropriate |
2 | Phu Huu 1 Multipurpose Terminal |
|
|
| Multipurpose terminal | 1.00 | 30.000 | 1 / 250 | 17,50 | 1,00 | 30.000 | 1 / 250 | 17,50 | 6,40 | 30.000 | 3 / 650 | 35,00 |
|
3 | Phuoc Khanh Multipurpose Terminal (Terminal 1 – Vamco Biochemical Terminal) |
|
|
| Multipurpose terminal | 0,00 |
|
|
| 0,00 |
|
|
| 1,00 | 30.000 | 1 / 250 | 22,30 |
|
4 | Phuoc Khanh Multipurpose Terminal |
|
|
| Multipurpose terminal | 0,00 |
|
|
|
|
|
|
| 3,30 | 30.000 | 1 / 200 | 15,00 |
|
5 | Phuoc Khanh Multipurpose Terminal (Terminal 3 – Phuc Thanh Terminal) |
|
|
| Multipurpose terminal |
|
|
|
|
|
|
|
| 1,00 | 30.000 | 1 / 250 | 10,00 |
|
6 | Maritime Consultancy Center |
|
|
| Maritime services | 0,00 |
|
| 25,35 | 0,00 |
|
| 25,35 | 0,00 |
|
| 25,35 |
|
7 | Terminal of Cau Kien Be Tong Company |
|
|
| Dedicated terminal | 0,50 | 15,000 | 1 / 270 | 9,56 | 0,50 | 15.000 | 1 / 270 | 9,56 | 0,50 | 15.000 | 1 / 270 | 9,56 |
|
8 | Cong Thanh Cement Terminal |
|
|
| Cement terminal | 0,60 | 30.000 | 1 / 230 | 17,73 | 0,60 | 30.000 | 1 / 230 | 17,73 | 0,60 | 30.000 | 1 / 230 | 17,73 |
|
9 | Lafarge Cement Terminal | 1 / 201 | 30.000 | 6,38 | Cement terminal | 0,60 | 30.000 | 1 / 201 | 6,38 | 0,60 | 30.000 | 1 / 201 | 6,38 | 0,60 | 30.000 | 1 /201 | 6,38 |
|
10 | Terminal of Hi-tech Shipyard |
|
|
| Dedicated to shipbuilding and ship repair | 0,00 |
|
| 20,30 | 0,00 |
|
| 20,30 | 0,00 |
|
| 20,30 |
|
11 | Multipurpose Terminal of Ong Keo Industrial Park (Tin Nghia Terminal) |
|
|
| Multipurpose terminal |
|
|
|
| 2,70 | 30.000 | 1 / 265 | 17,56 | 2,70 | 30.000 | 1 / 265 | 17,56 |
|
12 | Bao Tin Dedicated Terminal |
|
|
| Dedicated terminal | - | 30.000 | 1 / 212 | 8,43 | - | 30,000 | 1 / 212 | 8,43 | 0,00 | 30.000 | 1 / 212 | 8,43 |
|
13 | LPG Terminal of Hong Moc Private Enterprise | 1 / 207 | 5.000 | 5,61 | Oil terminal | 0,20 | 5.000 | 1 / 207 | 5,61 | 0,20 | 5.000 | 1 / 207 | 5,61 | 0,20 | 5.000 | 1 / 207 | 5,61 |
|
14 | Tram Anh Lubricant Terminal | 1 / 238 | 30.000 | 11,69 | Oil terminal | 0,20 | 30.000 | 1 / 238 | 11,69 | 0,20 | 30.000 | 1 / 238 | 11,69 | 0,20 | 30,000 | 1 / 238 | 11,69 |
|
15 | Terminal of AP Petrochimical Vietnam Ltd. | 1 / 150 | 15.000 | 8,71 | Oil terminal | 0,15 | 15.000 | 1 / 150 | 8,71 | 0,15 | 15.000 | 1 / 150 | 8.71 | 0,15 | 15.000 | 1 / 150 | 8,71 |
|
16 | Viko Wochimex Timber Terminal | 1 / 180 | 15.000 | 7,26 | For wood chips | 0,15 | 15.000 | 1 / 180 | 7,26 | 0,15 | 15.000 | 1 / 180 | 7,26 | 0,15 | 15.000 | 1 / 180 | 7,26 |
|
17 | Terminal of Sunsteel factory |
|
|
| Steel terminal | 0,00 |
|
|
| 0,50 | 30.000 | 1 / 200 | 40,00 | 2.00 | 30.000 | 3 / 639 | 139,13 |
|
18 | Potential dedicated Terminal |
|
|
| Dedicated terminal | 0,00 |
|
|
| 0,00 | 30.000 | / 530 |
| 0,00 | 30.000 | / 530 |
|
|
IV | TERMINALS ALONG THI VAI RIVER | 8 / 953 | 15.000 | 188,90 |
| 7,73 | 30.000 -60.000 | 10 / 1.532 | 200,70 | 11,58 | 30.000 -60.000 | 14 / 2.195 | 225,70 | 18,63 | 30.000 -60.000 | 16 / 2.810 | 268,20 |
|
1 | Phuoc Thai Multipurpose Terminal (Terminal 1) |
|
|
| Multipurpose terminal | 0,00 |
|
|
| 0,00 |
|
|
| 0,00 |
|
|
| To be invested after 2030 |
2 | Go Dau Multipurpose Terminal |
|
|
| Multipurpose terminal | 0,00 |
|
|
| 0,00 |
|
|
| 0,00 |
|
|
| To be invested after 2030 |
3 | Phuoc Thai Terminal (Vedan) | 2 / 340 | 10.000 -12.000 | 120,00 | Dedicated terminal | 1,13 | 10.000 -12.000 | 2 / 340 | 120,00 | 1,13 | 10.000 -12.000 | 2 / 340 | 120,00 | 1,13 | 10.000- 12.000 | 2 / 340 | 120,00 |
|
4 | Dong Nai Terminal (Go Dau A Terminal) | 1 / 170 | 2.000 | 17,60 | Multipurpose terminal | 1,00 | 5.000 -10.000 | 1 / 170 | 17,60 | 1,00 | 5.000 -10.000 | 3 / 350 | 17,60 | 1,00 | 5.000 -10.000 | 3 / 350 | 17,60 |
|
5 | Super Phosphate Long Thanh Terminal | 1 / 50 | 3.000 | 11,30 | For fertilizers and chemicals | 0,30 | 3,000 | 1 / 50 | 11,30 | 0,30 | 3.000 | 1 / 50 | 11,30 | 0,30 | 3.000 | 1 / 50 | 11,30 |
|
6 | Terminal of Unique Gas factory | 1 / 130 | 6.500 | 1,80 | Gas terminal | 0,20 | 6.500 | 1 / 130 | 1,80 | 0,20 | 6.500 | 1 / 130 | 1,80 | 0,20 | 6.500 | 1 / 130 | 1,80 |
|
7 | Dong Nai Terminal (Go Dau B Terminal) | 3 / 263 | 6.500 - 15.000 | 38,20 | Multipurpose terminal | 5,10 | 30.000 | 5 / 842 | 50,00 | 5,10 | 30.000 | 6 / 990 | 50.00 | 5,10 | 30.000 | 6 / 990 | 50,00 |
|
8 | Phuoc An Multipurpose Terminal |
|
|
| Multipurpose, container terminal | 0,00 |
|
|
| 3,85 | 60.000 | 1 / 335 | 25,00 | 10,90 | 60.000 | 3 / 950 | 67,50 |
|
| TOTAL | 20 / 2.887 |
| 266,67 |
| 22,83 |
| 32 / 5348 | 458,96 | 46,31 |
| 49 / 9.886 | 704,22 | 80,06 |
| 66 / 14.050 | 1.031,39 |
|
Note: Schedule for investment in the terminals varies according to estimated need for goods movement.
C. BINH DUONG SEAPORT
No. | Name | Condition | Class | Estimation (Planning) | Note | |||||||||||||
Quantity (pcs)/Total length (m) of wharves | Size of ship | Area (hectares) | By 2020 | By 2025 | By 2030 | |||||||||||||
Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | |||||||
1 | Binh Duong Terminal | 1 / 110 | 1.000-5.000 | 7,30 | Multipurpose terminal | 1,21 | 1.000-5.000 | 1 / 110 | 7.30 | 1,21 | 1.000-5.000 | 1 / 110 | 7,30 | 1,21 | 1.000-5.000 | 1 / 110 | 7,30 |
|
D. VUNG TAU SEAPORT
No. | Name | Condition | Class | Estimation (Planning) | Note | |||||||||||||
Quantity (pcs)/Total length (m) of wharves | Size of ship | Area (hectares) | By 2020 | By 2025 | By 2030 | |||||||||||||
Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | Capacity (million tonnes) | Size of ship | Quantity (pcs)/Total length (m) of wharves | Area (hectares) | |||||||
I | TERMINALS ALONG CAI MEP - THI VAI RIVER | 32/ 8.511 | 80.000 | 502,72 |
| 139,02 | 30.000-80.000 (200.000) | 548 / 13.177 | 940,89 | 164,92 | 30.000-80.000 (200.000) | 57 / 14.607 | 1.053,07 | 208,12 | 30.000-80.000 (200.000) | 70 / 17.999 | 1325,76 |
|
1 | Terminal of Cam Pha Cement Grinding Station | 1 /186 | 15.000 | 9,17 | Cement terminal | 1,87 | 15.000 | 1 / 186 | 9,17 | 1,87 | 15.000 | 1 / 186 | 9,17 | 1,87 | 15.000 | 1 / 186 | 9,17 |
|
2 | My Xuan A Terminal |
|
|
| Multipurpose terminal |
|
|
|
|
|
|
|
| 2,50 | 15.000 | 3 / 600 | 32,50 |
|
3 | Terminal of My Xuan Cement Grinding Station |
|
|
| Dedicated terminal |
|
|
|
| 1,50 | 30.000 | 2 / 330 | 16,35 | 1,50 | 30,000 | 2 / 330 | 16,35 |
|
4 | Sai Gon – Thep Viet Terminal |
|
|
| Steel terminal | 1,50 | 30.000 | 1 / 200 | 17,00 | 3,50 | 30.000 | 2 / 400 | 33,83 | 3,50 | 30,000 | 2 / 400 | 33,83 |
|
5 | Hong Quang Multipurpose Terminal |
|
|
| Multipurpose terminal |
|
|
|
|
|
|
|
| 3,20 | 30.000 | 2 / 395 | 39,69 |
|
6 | Sao Bien International Terminal |
|
|
| Multipurpose, container terminal | 2,70 | 30.000 | 1 / 300 | 68,02 | 2,70 | 30.000 | 1 / 300 | 68,02 | 2,70 | 30.000 | 1 / 300 | 68,02 |
|
7 | Terminal of Vinalines Shipyard |
|
|
| Dedicated to shipbuilding and ship repair |
|
|
|
|
|
|
|
|
|
|
|
| To be invested in when appropriate |
8 | My Xuan multipurpose and container terminal |
|
|
| Multipurpose, container terminal |
|
|
|
| 1,50 | 50.000 | 1 / 300 | 25,00 | 5,90 | 50.000 | 2 / 700 | 50,30 |
|
9 | My Xuan International Multipurpose Terminal |
|
|
| Multipurpose, container terminal | 2,60 | 60.000 | 2 / 463 | 62,00 | 2,60 | 60.000 | 2 / 463 | 62,00 | 16,10 | 60.000 | 4 / 1.100 | 172,00 |
|
10 | Oil Terminal of Phu My Power Plant | 2 /412 | 10.000 | 8,59 | Oil terminal | 4,00 | 10.000 | 2 / 412 | 8,59 | 4,00 | 10.000 | 2 / 412 | 8,59 | 4,00 | 10.000 | 2 / 412 | 8,59 |
|
11 | Terminal of Thi Vai Cement Grinding Factory (Holcim) | 1 /246 | 50.000 | 18.00 | Cement terminal | 1,50 | 50.000 | 1 / 246 | 18,00 | 1,50 | 50.000 | 1 / 246 | 18,00 | 1,50 | 50.000 | 1 / 246 | 18,00 |
|
12 | Saigon International Terminals –Vietnam (SITV) | 3 /728 | 60.000 | 33,73 | Container terminal | 12,10 | 60.000 | 3 / 728 | 33,73 | 12,10 | 60.000 | 3 / 728 | 33,73 | 12,10 | 60.000 | 3 / 728 | 33,73 |
|
13 | Thi Vai International Terminal (invested before steel terminal) |
|
|
| Multipurpose terminal | 1,00 | 10.000-30.000 | 1 / 220 | 15.00 | 1,00 | 10.000-30.000 | 1 / 220 | 15,00 | 6,90 | 10.000-30.000 | 3 / 680 | 41,00 | Multipurpose terminal to be invested after 2020 |
14 | Phu My – Ba Ria Serece Terminal | 2 /700 | 60.000 | 23,03 | Multipurpose terminal | 7,00 | 10.000 - 80.000 | 4 / 700 | 23,03 | 7,00 | 10.000- 80.000 | 4 / 700 | 23,03 | 7,00 | 10.000 - 80.000 | 4 / 700 | 23,03 |
|
15 | PTSC Phu My Terminal | 2/384 | 30.000 | 27,46 | Multipurpose terminal | 3,00 | 10.000-30.000 | 1 / 384 | 27,46 | 3,00 | 10.000-30,000 | 1 / 384 | 27,46 | 3,00 | 10,000-30.000 | 1 / 384 | 27,46 |
|
16 | Terminal of Phu My Steel Factory | 1 /230 | 50.000 | 22,00 | Steel terminal | 1,30 | 50.000 | 2 / 420 | 22,00 | 1,30 | 50.000 | 2 / 420 | 22,00 | 1,30 | 50.000 | 2 / 420 | 22,00 |
|
17 | Cai Mep – Thi Vai International Terminal | 2 / 600 | 75.000 |
| Multipurpose terminal | 3,00 | 75.000 | 2 / 600 | 27,00 | 3,00 | 75.000 | 2 / 600 | 27,00 | 3,00 | 75.000 | 2 / 600 | 27,00 |
|
18 | SP-PSA International Terminal | 2 / 600 | 50.00080.000 | 28,20 | Container terminal | 8.80 | 80.000 (120.000) | 2 / 600 | 28,20 | 8,80 | 80.000 (120.000) | 2 / 600 | 28,20 | 16,50 | 80.000 (120.000) | 4 / 1.200 | 56,40 |
|
19 | Posco Terminal | 1 / 333 | 45.000 | 15,09 | Steel terminal | 2,86 | 50.000 | 1 / 333 | 15,09 | 2,86 | 50.000 | 1 / 333 | 15,09 | 2,86 | 50.000 | 1 / 333 | 15,09 |
|
20 | Posco SS Terminal |
|
|
| Steel terminal | 1,75 | 50.000 | 1 / 267 | 12,61 | 1,75 | 50.000 | 1 / 267 | 12,61 | 1,75 | 50.000 | 1 / 267 | 12,61 |
|
21 | Ban Thach Multipurpose Terminal |
|
|
| Multipurpose terminal |
|
|
|
|
|
|
|
|
|
|
|
| To be invested after 2030 |
22 | Terminals of Ba Son Shipyard |
|
|
| Dedicated to shipbuilding and ship repair | 1,50 | 70.000-150.000 | 4 / 700 | 73,50 | 1,50 | 70.000-150.000 | 4 / 700 | 73,50 | 1,50 | 70.000-150.000 | 4 / 700 | 73,50 |
|
23 | Interflour Terminal | 1 / 308 | 75.000 | 7,57 | For farm produce | 1,80 | 75.000 | 1 / 308 | 24,00 | 1,80 | 75.000 | 1 / 308 | 24.00 | 1,80 | 75.000 | 1 / 308 | 24.00 |
|
24 | Tan Cang Cai Mep Container Terminal | 3 / 890 | 80.000 | 61,18. | Container terminal | 16,50 | 80.000 (110.000) | 3 / 890 | 61,18 | 16,50 | 80.000 (110.000) | 3 / 890 | 61,18 | 16,50 | 80.000 (110.000) | 3 / 890 | 61,18 |
|
25 | Hoa Sen – Gemadept International Terminal |
|
|
| Multipurpose, container terminal | 4,10 | 30.000-50.000 | 1 / 286 | 6,81 | 4,10 | 30.000-50.000 | 1 / 286 | 6,81 | 4,10 | 30.000-50.000 | 1 / 286 | 6,81 |
|
26 | Cai Mep LGP Terminal | 2 / 362 | 2.000-30.000 | 40,00 | For LPG and condensate | 1,30 | 2.000-30.000 | 2 / 362 | 40,00 | 1,30 | 2.000-30.000 | 2 / 362 | 40,00 | 1,30 | 2.000-30.000 | 2 / 362 | 40,00 |
|
27 | Petec Cai Mep Oil Terminal | 2 / 452 | 5.000-60.000 | 31,60 | Oil terminal | 5,00 | 5.000-60.000 | 2 / 452 | 31,60 | 5,00 | 5.000-60.000 | 2 / 452 | 31,60 | 5,00 | 5.000-60.000 | 2 / 452 | 31,60 |
|
28 | Cai Mep Oil Terminal | 1 /280 | 80.000 | 20,60 | Oil terminal | 1,38 | 80.000 | 1 / 280 | 20,60 | 1,38 | 80.000 | 1 / 280 | 20,60 | 1.38 | 80.000 | 1 / 280 | 20,60 |
|
29 | LDC - VTSC Terminal |
|
|
| Multipurpose terminal | 3,60 | 80.000 | 1 / 290 | 13,20 | 3,60 | 80.000 | 1 / 290 | 13,20 | 3,60 | 80.000 | 1 / 290 | 13,20 |
|
30 | Cai Mep International Terminal (CMIT) | 2 / 600 | 80.000 (160.000) | 48,00 | Container | 12,65 | 80.000 (160.000) | 2 / 600 | 48,00 | 12,65 | 80.000 (160.000) | 2 / 600 | 48,00 | 12,65 | 80.000 (160,000) | 2 / 600 | 48,00 |
|
31 | Cai Mep – Thi Vai International Terminal | 2 / 600 | 80.000 100.000 | 48,00 | Container terminal | 8,14 | 80.000- 100.000 | 2 / 600 | 48,00 | 8,14 | 80.000100.000 | 2 / 600 | 48,00 | 8.14 | 80.000 100.000 | 2 / 600 | 48,00 |
|
32 | SP-SSA International Container Terminal | 2 / 600 | 80.000 (160.000) | 60,50 | Container terminal | 17,27 | 80.000 (160.000) | 2 / 600 | 60,50 | 17,27 | 80.000 (160.000) | 2 / 600 | 60,50 | 17,27 | 80.000 (160.000) | 2 / 600 | 60,50 |
|
33 | Gemalink Container Terminal |
|
|
| Container terminal | 8,80 | 80.000 (200.000) | 500 / 1.150 | 71,60 | 18,70 | 80.000 (200.000) | 3 / 1.150 | 71,60 | 18,70 | 80.000 (200.000) | 3 / 1.150 | 71,60 |
|
34 | Cai Mep Ha Multipurpose and Container Terminal |
|
|
| Multipurpose terminal | 1,00 | 80.000 (160.000) | 1 / 300 | 35,00 | 6,50 | 80.000 (160.000) | 2 / 600 | 69,00 | 12,50 | 80.000 (160.000) | 3 / 900 | 80,00 |
|
35 | Cai Mep Downstream Terminal |
|
|
| Container terminal | 1.00 | 80.000200.000 | 1 / 300 | 20,00 | 6,50 | 80.000-200.000 | 2 / 600 | 40,00 | 6,50 | 80.000 - 200.000 | 2 / 600 | 40,00 |
|
II | TERMINALS ALONG DINH RIVER ANH GANH RAI BAY | 28 / 3.519 | 10.000 | 133,25 |
| 17,35 | 80.000 DWT | 32 / 5.039 | 297,25 | 20,15 | 80.000 DWT | 36 / 5.739 | 337,25 | 21,05 | 80.000 DWT | 36 / 5.421 | 317,25 |
|
1 | Cat Lo Commercial Terminal | 2 / 310 | 1.000-5.000 | 5,40 | Multipurpose and fish terminal | 1,00 | 1.000-5.000 | 2 / 310 | 5,40 | 1,00 | 1.000-5.000 | 2 / 310 | 5,40 | 1,00 | 1.000-5.000 | 2 / 310 | 5,40 |
|
2 | K2 Oil Terminal | 1 /162 | 5.000 | 0,12 | Oil terminal | 0,40 | 5.000 | 1 / 162 | 0,12 | 0,40 | 5.000 | 1 / 162 | 0,12 | 0,40 | 5.000 | 1 / 162 | 0,12 |
|
3 | Terminal of Dong Xuyen Industrial Park |
|
|
| Multipurpose terminal |
|
|
|
|
|
|
|
|
|
|
|
|
|
- | Multipurpose Terminal |
|
|
| Multipurpose terminal |
|
|
|
| 1.30 | 5.000-10.000 | 3 / 400 | 20,00 | 1,30 | 5.000-10.000 | 3 / 400 | 20,00 |
|
- | Vina Offshore Terminal | 1 / 158 | 10.000 | 1,82 | Dedicated terminal | 0,10 | 10.000 | 1 / 158 | 1,82 | 0,10 | 10.000 | 1 / 158 | 1,82 | 0,10 | 10.000 | 1 / 158 | 1,82 |
|
- | Terminal Thang Loi Oil Ltd. | 1 / 156 | 10.000 | 2,00 | Oil terminal | 0,30 | 10.000 | 1 / 156 | 2,00 | 0,30 | 10.000 | 1 / 156 | 2,00 | 0,30 | 10.000 | 1 / 156 | 2,00 |
|
- | Terminal of Sai Gon Shipyard and Maritime Mechanics Ltd. | 1 / 100 | 10.000 | 13,40 | Dedicated to shipbuilding and ship repair | 0,20 | 10.000 | 1 / 100 | 13,40 | 0.20 | 10,000 | 1 / 100 | 13,40 | 0,20 | 10.000 | 1 / 100 | 13,40 |
|
4 | VietsovPetro Terminal | 10 / 1.377 | 10.000 | 53,05 | For petroleum services | 5,00 | 10.000 | 10 / 1.377 | 53,05 | 5,00 | 10.000 | 10 / 1.377 | 53.05 | 5,00 | 10.000 | 10 / 1.377 | 53,05 |
|
5 | PTSC Petroleum service terminal | 9 / 820 | 5.000-10.000 | 21,80 | For petroleum services | 0,75 | 5.000-10.000 | 10 / 1.036 | 35,80 | 0,75 | 5.000-10.000 | 10 / 1.036 | 35,80 | 0,75 | 5.000-10.000 | 10 / 1.036 | 35,80 |
|
| Cu Lao Tao Oil Terminal | 1 / 133 | 10.000 | 27,16 | Oil terminal | 0,50 | 10.000 | 1 / 138 | 27,16 | 0,50 | 10.000 | 1 / 138 | 27,16 | 0,50 | 10.000 | 1 / 138 | 27,16 |
|
6 | Sao Mai – Ben Dinh Petroleum Service Center |
|
|
| For petroleum services | - | 20.000 | / 1063 | 98 | - | 20.000 | / 1063 | 98 | - | 20.000 | / 1063 | 98 |
|
| PV Shipyard Terminal | 1 /156 | 15.000 | 6,20 | For building, repairing ships and oil rigs | 0,10 | 15.000 | 1 / 156 | 6,20 | 0,10 | 15.000 | 1 / 156 | 6,20 | 0,10 | 15.000 | 1 / 156 | 6,20 |
|
| PVC-MS Terminal | 1 /142 | 10.000 | 2,30 | For petroleum services | 0,10 | 10.000 | 1 / 142 | 2,30 | 0,10 | 10.000 | 1 / 142 | 2,30 | 0,10 | 10.000 | 1 / 142 | 2,30 |
|
| Sao Mai – Ben Dinh Petroleum Service Wharf |
|
|
|
| - | 20.000 | 1 / 508 | 35 | - | 20.000 | 1 / 508 | 35 | -- | 20.000 | 1/508 | 35 | To be repurposed |
7 | Vung Tau Container Terminal |
|
|
| Container terminal |
|
|
|
|
|
|
|
|
|
|
|
| To be invested after 2030 |
8 | Potential terminal |
|
|
| Container terminal |
|
|
|
|
|
|
|
|
|
|
|
| Potential |
9 | Passenger terminal and tourism service complex |
|
|
| International passenger terminal |
| 50.000100.000 GRT |
|
|
| 50.000100.000 GRT |
|
|
| 50.000100.000 GRT |
|
| To be established in Bai Truoc area |
10 | Terminal of Long Son Industrial Service Center |
|
|
| Multipurpose and dedicated terminal | 1,20 | 10.000 | 2 / 296 | 20,00 | 1,20 | 10.000 | 2 / 296 | 20,00 | 2.10 | 20.000 | 3 / 486 |
|
|
11 | Terminal of Long Son Shipyard |
|
|
| Dedicated to shipbuilding and ship repair | 1,00 | 5.000-30.000 | / 500 | 95,00 | 1,00 | 5.000-30.000 | 500 | 95,00 | 1,00 | 5.000-30.000 | / 500 | 95,00 |
|
12 | Terminals of Long Son Petrochemical Complex |
|
|
| Dedicated terminal | 6,70 | 1.500-100.000 |
|
| 6,70 | 1.500-100.000 |
|
| 6,70 | 1.500-100.000 |
|
|
|
13 | Long Son Multipurpose Terminal |
|
|
| Multipurpose terminal |
|
|
|
| 1,50 | 80.000 | 1 / 300 | 20,00 | 1,50 | 80.000 | 1 / 300 | 20,00 |
|
III | CON DAO TERMINALS | 3 / 242 | 10.000DWT 50.000GRT | 3 |
| 0,03 | 10.000- 30.000DWT 50.000GRT | 4 / 442 | 7,70 | 0,03 | 10.000-30.000DWT | 5 / 670 | 15,20 | 0,03 | 10.000-30.000DWT | 5 / 670 | 15,20 |
|
1 | Ben Dam Terminal | 3 / 242 | 10.000DWT 50.000GRT | 2,70 | Multipurpose and passenger terminal | 0,03 | 10.000-30.000DWT | 3 / 242 | 2,70 | 0,03 | 10.000-30.000DWT | 3 / 242 | 2.70 | 0,03 | 10.000-30.000DWT | 3 / 242 | 2,70 |
|
2 | Maritime and petroleum service terminal |
|
|
| Multipurpose terminal |
| 30.000 | 1 / 200 | 5,00 |
| 30.000 | 2 / 428 | 12,50 |
| 30.000 | 2 / 428 | 12,50 |
|
3 | LNG Con Dao Terminal |
|
|
| Dedicated terminal |
|
|
|
|
|
|
|
|
|
|
|
| Under consideration |
| TOTAL | 63 / 12.272 |
| 638,67 |
| 156,4 |
| 584 18.658 | 1.246 | 185,1 |
| 98 / 21.016 | 1.406 | 229,2 |
| 111 / 24.090 | 1.658 |
|
Note: Schedule for investment in the terminals varies according to estimated need for goods movement.