Quyết định 3327/QD-BGTVT

Decision No. 3327/QD-BGTVT dated August 29, 2014, approval for detailed planning for seaports in the Southeast (group 5) by 2020 and the orientation towards 2030

Nội dung toàn văn Decision 3327/QD-BGTVT approval for detailed planning seaports southeast 2020 2014


MINISTRY OF TRANSPORT
-------

SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
---------------

No. 3327/QD-BGTVT

Hanoi, August 29, 2014

 

DECISION

APPROVAL FOR DETAILED PLANNING FOR SEAPORTS IN THE SOUTHEAST (GROUP 5) BY 2020 AND THE ORIENTATION TOWARDS 2030

MINISTER OF TRANSPORT

Pursuant to Maritime Code of Vietnam dated June 14, 2005;

Pursuant to the Law on Construction dated November 26, 2003;

Pursuant to the Government's Decree No. 107/2012/ND-CP dated December 20, 2012, defining the functions, tasks, entitlements and organizational structure of the Ministry of Transport;

Pursuant to the Government's Decree No. 92/2006/ND-CP dated September 07, 2006 on formulation, assessment, ratification, and management of socio-economic development master plans and the Government's Decree No. 04/2008/ND-CP dated January 11, 2008 on amendments to Decree No. 92/2006/ND-CP;

Pursuant to the Prime Minister’s Decision No. 1037/QD-TTg dated June 24, 2014 on amendments to Planning for development of Vietnam’s seaport system by 2020 and orientation towards 2030;

Pursuant to document No. 1178/TTg-KTN dated August 06, 2013 of the Prime Minister on improvement of management of Group 5 seaports and ports in Cai Mep – Thi Vai area;

In consideration of report No. 4634/TTr-CHHVN dated December 25, 2013 of Vietnam Maritime Administration;

At the request of Assessment Council and Director of Planning and Investment Department,

HEREBY DECIDES:

Article 1. Grant of approval for detailed planning for seaports in the Southeast (Group 5) by 2020 and the orientation towards 2030 with the following contents:

1. Viewpoint

- Make the best use of natural and socio-economic conditions of the region for port development; effectively use available land for port construction to improve the ability to receive large ships and develop potential for international transshipment of Group 5 seaports.

- Make the best use of available infrastructure of terminals and ports; make in-depth investment to improve capacity and meet demands for movement of goods carriage by sea in the Southeast and the South.

- Develop Group 5 seaports in association with connection of road, rail and inland waterway infrastructure to boost development of coastal economic zones, urban areas and major industrial parks in Ho Chi Minh City, Dong Nai, Ba Ria – Vung Tau, Binh Duong, Binh Phuoc and adjacent provinces.

- Combine harmonious development of dedicated ports for bulk cargo, liquid cargo, farm produce, etc. to serve movement of goods in the entire area.

- Provide land and water surface for development of multipurpose terminals, container ports, or dedicated ports serving the entire area.

- Enhance application of advanced technologies in management and operation of seaports, especially at major ports in Cai Mep – Thi Vai area (Ba Ria – Vung Tau), Cat Lai, Hiep Phuoc (Ho Chi Minh City).

- Expedite and associate relocation of ports in urban areas with traffic organization in seaport urban areas in a harmonious manner to avoid conflicting traffic connecting the port and urban areas.

- Utilize every social resource, especially from the private sector and foreign direct investment for development seaports and public infrastructure of seaports.

- Port development must be sustainable; seaport development shall be in association with environmental protection, ecology protection, and avoidance of negative impacts on social activities within the area. The development and operation of seaports in the area shall be in association with protection of the ecology of Ganh Rai bay, mangrove forests in Can Gio and along Thi Vai River; ensure that there are not negative impacts on tourism potential of Ho Chi Minh City and Vung Tau city.

- Seaport development shall be in association with national defense and security.

2. Development targets and orientation

a) General targets

- Reasonable arrange Group 5 seaports to develop potential, facilitate a balanced and uniform development of seaports and relevant infrastructure, combine development of industry and services as the motive for economic development and assurance of national defense and security.

- Relocate the ports along Sai Gon River and Ba Son shipyard to relieve the burden on the center of Ho Chi Minh City.

- Support the development of industrial parks and export-processing zones; facilitate urban area development to boost the industrialization and modernization process of the Southeast by 2020 with an orientation towards 2030.

- Establish and develop modern international ports and central ports to facilitate sea transport development of Vietnam and the world; attract part of transshipped goods in the region.

b) Specific targets

- Estimated quantity of goods movement at various times: 238,0 - 247,8 million tonnes by 2020; 294,1 - 316,4 million tonnes 2025; 358,5 to 411,5 million tonnes 2030, in which container cargo accounts for: 9,72 - 10,54 million TEU by 2020; 13,23 - 14,99 million TEU by 2025; 17,41 - 20,45 million TEU by 2030.

-  Estimated quantity of tourists by sea through the ports at various times: 187400 – 271100 arrivals by 2020; 240000 - 437400 arrivals by 2025; 307400 - 705800 arrivals by 2030;

- Capacity of ships: general ships; bulk cargo ships with a deadweight tonnage of from 10.000 tonnes to over 100.000 tonnes, container ships with a deadweight tonnage of from 10.000 tonnes to over 100.000 tonnes, crude oil ships with a deadweight tonnage of up to 300.000 tonnes, oil product ships with a deadweight tonnage of 10.000 tonnes – 50.000 tonnes, passengers ships for the transport of up to 6.000 people.

3. Planning content

a) Detailed planning for Group 5 ports:

Group 5 has 04 seaports: Ho Chi Minh City Seaport, Dong Nai Seaport, Vung Tau Seaport (including Con Dao Port) and Binh Duong Seaport.

- Ho Chi Minh City Seaport: a national central multipurpose Terminal (Class I) which comprises terminals along Sai Gon river, Cat Lai terminals along Dong Nai river, terminals along Nha Be river, and Hiep Phuoc terminals along Soai Rap river.

Estimated capacity of goods movement: 115,7 - 116,3 million tonnes per year by 2020; 127,4 - 130,7 million tonnes per year by 2025; 144,1 - 156,3 million tonnes per year by 2030. Estimated capacity of container movement: 4,78 - 4,88 million TEU/year by 2015; 5,37 – 5.50 million TEU/year by 2020; 6.118- 6.487 million TEU/year by 2025; 7.336 – 8.092 million TEU/year by 2030.

Expected movement of international passengers by sea: 64500 - 93300 arrivals/year by 2020; 82600 - 150600 arrivals/year by 2025; 105900 - 243000 arrivals/year by 2030.

Detailed planning for primary terminals:

+ Terminals along Sai Gon river: 11 terminals/docks for ships with a deadweight tonnage of 20.000 – 30.000 tonnes. These terminals shall be relocated and repurposed in accordance with the Prime Minister’s Decision No. 791/QD-TTg dated August 12, 2005; part of the Khanh Hoi terminal shall be converted into an inland passenger terminal and maritime service center. Unrelocated wharves shall be upgraded, not expanded.

+ Cat Lai terminals (Dong Nai river): 09 terminals/docks for ships with a deadweight tonnage of up to 30.000 tonnes. These are currently the primary container terminals of Ho Chi Minh City Seaport.

+ Nha Be terminals (Nha Be river): 10 terminals/docks for ships with a deadweight tonnage of 20.000 – 30.000 tonnes. Terminals along Nha Be river shall be upgraded (not expanded) to serve ships with a deadweight tonnage of up to 30.000 tonnes. A new passenger terminal for ships with a capacity of 50.000 GRT shall be built in Phu Thuan (by Phu My bridge).

+ Hiep Phuoc terminals (Soai Rap river): primary terminals of Ho Chi Minh City Seaport in the future for general goods and containers of ships with a deadweight tonnage of 50.000 tonnes and container ships with a capacity of up to 4.000 TEU; some dedicated terminals for ships with a deadweight tonnage of 20.000 - 30.000 tonnes directly serving adjacent industrial facilities.

+ Can Giuoc – Long An terminals (on Soai Rap river): multipurpose terminals for ships with a deadweight tonnage of 20.000 – 50.000 tonnes and 70.000 tonnes partially loaded going through Soai Rap sanctuary, satellite terminals of central ports in Ho Chi Minh City area.

- Dong Nai Seaport: National and central multipurpose terminal (Class I ) which comprises: Long Binh Tan terminals (Dong Nai river); Phu Huu terminals (segments of Dong Nai river and Long Tau – Nha Be river), Ong Kep terminals (Long Tau and Dong Tranh rivers); Go Dau terminals and Phuoc An terminals (Thi Vai river).

Estimated capacity of goods movement: 19,7 - 21,0 million tonnes per year by 2020; 32,4 - 35,1 million tonnes per year by 2025; 51,5 - 58,5 million tonnes per year by 2030. Estimated capacity of container movement: 0,69 - 0,77 million TEU/year by 2020; 1,38 - 1,57 million TEU/year by 2025; 2,41 - 2,83 million TEU/year by 2030.

Detailed planning for primary terminals:

+ Phuoc An, Go Dau terminals (on Thi Vai river): primary terminals of Dong Nai Seaport for general ships and container ships with a deadweight tonnage of up to 60.000 tonnes (Phuoc An) and 30.000 tonnes (Go Dau); some dedicated terminals for ships with a deadweight tonnage of 6.500 - 12.000 tonnes directly serving adjacent industrial facilities.

+ Phu Huu, Nhon Trach, Ong Keo Terminals (Dong Nai, Nha Be, Long Tau rivers): dedicated terminals for ships with a deadweight tonnage of 10.000 – 30.000 tonnes and multipurpose terminals for ships with a deadweight tonnage of up to 30.000 tonnes serving factories and industrial facilities in the area.

+ Terminals along Dong Nai: terminals for general ships and ships carrying bulk cargo containers of up to 5.000 tonnes, dedicated terminals for ships with a deadweight tonnage of up to 1.000 tonnes in Long Binh Tan area (Dong Nai).

- Binh Duong Seaport: a local multipurpose terminal (Class II) along Dong Nai river which comprises 01 terminal for ships with a deadweight tonnage of up to 5.000 tonnes and container handling.

Estimated capacity of goods movement: 0,99 - 1,21 million tonnes per year by 2020 and remains unchanged during 2025 – 2030.

- Vung Tau Seaport: a national multipurpose terminal, international gateway (Class IA) which plays a role as an international transshipment port, comprising: Go Dau, Tac Ca Trung terminals; Phu My, My Xuan terminals;  Cai Mep, Sao Mai – Ben Dinh terminals; Long Son terminals; Ding river terminals and Con Dao terminals.

Estimated capacity of goods movement: 101,6 - 109,2 million tonnes per year by 2020; 133,2 - 149,4  million tonnes per year by 2025; 161,8-195,5 million tonnes per year by 2030. Estimated capacity of container movement: 1,51 - 1,63 million TEU/year by 2015; 3,58 – 4,17 million TEU/year by 2020; 5,64 - 6,83 million TEU/year by 2025; 7,58 – 9,42 million TEU/year by 2030.

Expected movement of international passengers by sea: 122900 - 177700 arrivals/year by 2020; 157400 - 286800 arrivals/year by 2025; 201600 - 462800 arrivals/year by 2030.

Detailed planning for primary terminals:

+ Go Dau, Tac Ca Trung terminals: for general ships and container ships, capable of receiving ships with a deadweight tonnage of up to 30.000 tonnes.

+ Phu My, My Xuan terminals (Thi Vai river): for general ships with a deadweight tonnage of 50.000 – 80.000 tonnes; container ships with a capacity of up to 4.000 TEU. Shipping lanes shall be upgraded and expanded to receive ships with a deadweight tonnage of 60.000 – 120.000 tonnes (4.000 – 8.000 TEU) at Phu My and up to 60.000 tonnes at My Xuan; some terminals are dedicated to serving industrial and services facilities.

+ Cai Mep, Sao Mai – Ben Dinh terminals are primary terminals of the port which handle containers exported and imported of long shipping routes and international container transshipment. Cai Mep terminals are capable of receiving ships with a deadweight tonnage of 80.000 – 100.000 tonnes (6.000 – 8.000 TEU); shipping lanes shall be upgraded to receive ships with a deadweight tonnage of over 100.000 tonnes at Cai Mep. Sao Mai – Ben Dinh terminals area capable of receiving container ships with a deadweight tonnage of from 80.000 tonnes (6.000 TEU) to over 100.000 tonnes and international passenger ships with a capacity of up to 100.000 GRT.

+ Long Son terminals: dedicated to the oil refinery complex with terminals for receiving crude oil ships with a deadweight tonnage of 300.000 tonnes, ships with a deadweight tonnage of 30.000 – 50.000 tonnes carrying other materials and exports. The southeast coast is meant to build a multipurpose terminal serving long-term development of the area.

+ Vung Tau – Song Dinh terminals: capable of general ships with a deadweight tonnage of 10.000 tonnes (Dong Xuyen Industrial Park).

+ Con Dao terminals: general terminals and passenger terminals of Con Dao, capable of receiving ships with a deadweight tonnage of 2.000 - 5.000 tonnes. There are also maritime service terminals and oil terminals for ships with a deadweight tonnage of up to 10.000 tonnes.

b) Relocation plan:

Other terminals along Sai Gon river which are connected to Cat Lai, Thu Duc, Long Thanh, Vung Tau and Dong Nai industrial parks by Phu My bridge shall keep operating and might be relocated after 2020 if necessary.

(A list of capacity and functions of each port in the Group is provided in the Appendix enclosed with this Decision).

c) Plan for buoy wharves:

Buoy wharves on the shipping lanes are only temporary in areas where permanent terminals yet to be feasible. The construction of buoy wharves must be in association with development planning and appropriate for permanent terminals. When construction of a permanent terminal is completed, the investor in the buoy wharf shall relocate it to ensure safety and effective operation of the permanent terminal.

d) Plan for upgrade of shipping lanes:

- Sai Gon – Vung Tau lane: upgrade some sharp turns, maintain depth and maritime signaling system for ships with a deadweight tonnage of 30.000 tonnes; utilize tidal current both day and night.

- Soai Rap lane: dredged to the depth of -9,5 m, capable of ships with a deadweight tonnage of up to 30.000 tonnes fully loaded and 50.000 tonnes partially loaded. In the next period: monitor developments and assess the dredging result (-9.5 m) to consider dredging to serve ships with a deadweight tonnage of up to 50.000 tonnes fully loaded and over 50.000 tonnes partially loaded.

- Dong Nai lane: Maintain operation of the 36-km segment from Mui Den Do junction to Dong Nai Port.

- Cai Mep – Thi Vai channel: Determine the largest size of ships able to enter the terminals; estimate sizes of ships for each terminal group: Cai Mep terminals for ships with a deadweight tonnage of 80.000 – >100.000 tonnes, container ships with a deadweight tonnage of 6.000 – 8.000 TEU; Phu My (Thi Vai) terminals for ships with a deadweight tonnage of 60.000 – 100.000 tonnes, container ships with a deadweight tonnage of 4.000 - 8.000 TEU ships; Phuoc An, My Xuan terminals for ships with a deadweight tonnage of up to 60.000 tonnes; Go Dau terminals for ships with a deadweight tonnage of up to 30.00 tonnes.

- Ding river lane: Maintain conditions for operation of ships with a deadweight tonnage of 10.00 tonnes.

dd) Projects given priority by 2020

- Cai Mep – Thi Vai lane: complete comprehensive study into Cai Mep – Thi Vai lane as the basis for preparing investment plans, etc. to attract shippers to Cai Mep – Thi Vai area.

- Soai Rap lane: assess the stability of -9.5m depth lane, consider dredging for ships with a deadweight tonnage of 50.000 tonnes and over 50.000 tonnes partially loaded (reduced load, utilizing tidal current) to enter Hiep Phuoc terminals.

- Invest in terminals dedicated to oil refinery at Long Son: import of crude oil, export of oil products, import of materials

- Port-connecting roads:

+ Highway 51 (Dong Nai – Ba Ria Vung Tau): complete upgrading Highway 51 connecting Cai Mep – Thi Vai terminal system and the local traffic network.

+ Inter-port Cai Mep - Thi Vai road (Ba Ria - Vung Tau): expedite construction of the road after SP-PSA International Port, Thi Vai International Port and Ba Son Shipyard in Phu My.

+ Invest in construction of Road 991B and Phuoc Hoa – Cai Mep road to connect Cai Mep – Thi Vai terminals and Cai Mep Ha Logistics Center.

+ Roads to Hiep Phuoc terminals: finish North – South roads to Hiep Phuoc terminals and main roads to terminals of the industrial park, especially Road D3 to Sai Gon Hiep Phuoc terminal.

4. Policies, mechanism, and solutions

a) Regarding general port development

- Enhance private sector involvement in development of seaport infrastructure. Enhance investment promotion, encourage and enable all domestic and foreign economic sectors to invest in seaport development; state budget shall focus on investment in public infrastructure works (shipping lanes, common breakwaters) connected to important seaports.

- Keep boosting administrative procedure reform in management of investment and port operation towards simplification and international integration. Improve office of port authorities and regulatory bodies at new terminals to ensure timely state management of them. Improve state management of planning for development of seaports in the Group; ensure cooperation and harmony with planning for development of local traffic network, construction planning, and socio-economic development master plans of the areas where the ports are located.

- Encourage construction of common terminals at economic zones and industrial parks to improve effectiveness of investment and use of coastlines. Ensure at least 500 – 700 m in width of land for port development along big rivers with potential for port development (Cai Mep - Thi Vai, Soai Rap, Long Tau, Nha Be, Dong Nai, etc.). Provide land area behind the ports to build goods distribution centers which plan the role as logistics centers.

b) Policies on and organization of port relocation

- Policies on and organization of relocation of ports along Sai Gon river and Ba Son shipyard are specified in the Prime Minister’s Decision No. 791/QD-TTg dated August 12, 2005 and other directive documents.

- Financial policies: specified in the Prime Minister’s Decision No. 74/2005/QD-TTg dated April 06, 2005 on use of revenues from transfer of land use right, liquidation of factories and other works upon relocation of business organizations and factories under planning; the Prime Minister’s Decision No. 46/2010/QD-TTg dated April 24, 2010 of the Prime Minister promulgating Financial policies on relocation of ports along Sai Gon river and Ba Son shipyard and relevant legal documents.

- Other policies on relocation may be reported to the Steering Committee for relocation of ports along Sai Gon river and Ba Son shipyard; ultra vires issues may be reported to the Prime Minister.

c) Mechanism for encouragement of international transit of goods

- Enhance application of policies encouraging development of international transit of goods and establishment of basic infrastructure, organize the management, operation, provision of financial and banking services and other services necessary for improvement of competitiveness, attraction and movement of internationally transited goods in the region.

- Encourage and expedite construction of logistics centers in Cai Mep Ha area.

Article 2. Management and organization of planning implementation

1. Vietnam Maritime Administration

- Cooperate with People’s Committees of provinces and relevant agencies in publishing and managing implementation of approved planning, especially for new construction of wharves and terminals in their provinces, ensure that construction of new wharves and terminals does not exceed the need for goods movement under approved planning; propose adjustments and updates to planning for ports and terminals to the Ministry of Transport.

- Annually cooperate with local governments and relevant organizations in assessing the implementation of port development planning; propose actions against projects that fail to comply with the planning to the Ministry of Transport.

- Organize the implementation of seaport development planning in association with implementation of solutions for improve effectiveness of seaports and terminals specified in Decision No. 3304/QD-BGTVT dated October 25, 2013 of the Minister of Transport.

2. Ministries, professional regulatory bodies and the People’s Committees of provinces

- Ministries, professional regulatory bodies and the People’s Committees of provinces shall instruct investors to plan projects for construction, renovation and upgrade of seaports and shipping lanes in accordance with approved planning and regulations of law on construction.

- Ministries, professional regulatory bodies and the People’s Committees of provinces shall instruct competent authorities to propose addition of terminals to the planning to Vietnam Maritime Administration; Vietnam Maritime Administration shall submit reports to the Ministry of Transport for consideration.

- The People’s Committees of provinces, pursuant to approved planning, shall strictly manage and properly use land area dedicated to port construction; provide land area for harmonious development of ports and infrastructure connected thereto, logistics centers and maritime service centers in order to ensure smooth operation of seaports; cooperate with the Ministry of Transport in organizing the transport system in a manner that avoids conflicting traffic between the ports and urban areas; reach an agreement the Ministry of Transport in the scale and progress of port construction projects before allocating land or issuing a certificate of investment to a seaport terminal construction project.

Article 3. This Decision comes into force from the day on which it is signed and replaces Decision No. 1745/QD-BGTVT dated August 03, 2011 of the Minister of Transport.

Article 4. Chief of Office, Chief Inspector of the Ministry of Transport, Directors of Departments, Director of Vietnam Maritime Administration, heads of agencies, relevant organizations and individuals are responsible for the implementation of this Decision./.

 

 

MINISTER




Dinh La Thang

 


APPENDIX

LIST OF PORTS AND TERMINALS IN THE SOUTHEAST (GROUP 5) BY 2020 AND ORIENTATION TOWARDS 2030
(Enclosed with Decision No. 3327/QD-BGTVT dated August 29, 2014 of the Minister of Transport)

A. HO CHI MINH CITY SEAPORT

No.

Name

Condition

Class

Estimation (Planning)

Note

Quantity (pcs)/Total length (m) of wharves

Size of ship
(DWT)

Area (hectares)

By 2020

By 2025

By 2030

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

1

TERMINALS ALONG SAIGON RIVER

52 / 8673

5.000 - 30.000

210,97

 

23,48

30.000

25 / 4198

128,76

23,48

30.000

25 / 4198

118,76

23,48

30.000

25 / 4198

128,76

 

1

Terminals of Ba Son Shipyard

6 / 754

6.000 -10.000

26,40

Dedicated to shipbuilding and ship repair

 

 

 

 

 

 

 

 

 

 

 

 

To be relocated

2

Sai Gon Terminal

15 / 2.745

10.000 - 30.000

45,83

Multipurpose terminal

5,25

10.000 -30.000

5 / 995

20,52

5,25

10.000­ -30.000

5 / 995

20,52

5,25

10.000­ -30.000

5 / 995

20,52

 

-

Nha Rong + Khanh Hoi terminals

10 / 1.750

10.000­ -30.000

25,31

Multipurpose terminal

 

 

 

 

 

 

 

 

 

 

 

 

To be repurposed

-

Other terminals

5 / 995

10.000 -30.000

20,52

Multipurpose terminal

5,25

10.000 -30.000

5 / 995

20,52

5,25

10.000 -30.000

5 / 995

20,52

5,25

10.000 -30.000

5 / 995

20,52

 

3

Tan Thuan Dong Terminal

1 / 149

15.000

2,95

Multipurpose terminal

 

 

 

 

 

 

 

 

 

 

 

 

To be relocated

4

Ben Nghe Terminal

4 / 816

10.000 -30.000

32,00

Multipurpose terminal

4,70

10.000­ -30.000

4 / 816

32,00

4,70

10.000 -30.000

4 / 816

32,00

4,70

10.000­ -30,000

4 / 816

32,00

 

5

VICT Terminal

4 / 678

15.000­- 20.000

28,26

Container terminal

6,05

15.000­- 20.000

4 / 678

28,26

6,05

15.000­- 20.000

4 / 678

28,26

6,05

15.000­ -20.000

4 / 678

28,26

 

6

ELF Gas Sai Gon Terminal

1 / 26

3.000

2,00

Gas terminal

0,10

3.000

1 / 26

2,00

0,10

3.000

1 / 26

2,00

0,10

3.000

1 / 26

2,00

 

7

Bien Dong Terminal

2 / 140

5.000

3,10

Multipurpose terminal

0,35

5.000

2 / 140

3,10

0,35

5.000

2 / 140

3,10

0,35

5,000

2 / 140

3,10

 

8

Terminals of Sai Gon Shipyard

1 / 123

10.000

11,36

Dedicated to shipbuilding and ship repair

0,25

10,000

2 / 273

11,36

0,25

10.000

2 / 273

11,36

0,25

10.000

2 / 273

11,36

 

9

Rau Qua Terminal (Vegetable Terminal)

1 / 222

20.000

7,24

Multipurpose terminal

 

 

 

 

 

 

 

 

 

 

 

 

To be repurposed

10

Bong Sen Terminal

2 / 275

30.000

6,00

Multipurpose terminal

1,53

30.000

2 / 275

11,00

1,53

30.000

2 / 275

11,00

1,53

30.000

2 / 275

11,00

 

II

TERMINALS ALONG DONG NAI RIVER

20 / 3.848

30.000

185,33

 

59,26

30.000

23 / 4.578

238,56

59,26

30.000

23 / 4.578

238,56

67,71

30.000

26 / 5.078

274,56

 

1

ITC Phu Huu International Terminal

4 / 900

30.000

36,57

Multipurpose terminal

6,14

30.000

4 / 900

36,57

6,14

30.000

4 / 900

36,57

6,14

30.000

4 / 900

36,57

 

2

Terminal of Ha Tien 1 Cement JSC

1 / 205

20.000

 

Cement terminal

3,42

20.000

1 / 205

23,23

3,42

20.000

1 / 205

23.23

3,42

20.000

1 / 205

23,23

 

3

Phu Huu Terminal

2 / 320

30.000

24,00

Multipurpose terminal

6,50

30.000

3 / 550

24,00

6,50

30.000

3 / 550

24,00

6.50

30.000

3 / 550

24,00

 

4

Tan Cang Cat Lat Terminal

7 / 1.462

30.000

76,05

For container

36,30

30,000

7 / 1.462

76,05

36,30

30.000

7 / 1.462

76,05

36,30

30,000

7 / 1.462

76,05

 

5

Sai Gon Shipyard Terminal

3 / 256

5.000

9,71

Dedicated to shipbuilding and ship repair

0,50

5.000

3 / 256

9,71

0,50

5,000

3 / 256

9,71

0,50

5.000

3 / 256

9,71

 

6

Sai Gon Petro Terminal

2 / 500

25.000­ -32.000

26,00

Oil terminal

1,70

25.000­ -32.000

2 / 500

26,00

1,70

25.000­ -32.000

2 / 500

26,00

1.70

25.000­ -32.000

2 / 500

26,00

 

7

Holcim Vietnam Terminal

1 / 205

20.000

13,00

Cement terminal

2,20

20.000

1 / 205

13,00

2,20

20.000

1 / 205

13,00

2,20

20.000

1 / 205

13,00

 

8

Terminal of Cat Lai Industrial Park

 

 

 

Multipurpose terminal

2,50

20.000

2 / 500

30,00

2,50

20.000

2 / 500

30,00

10,95

20.000

5 / 1.000

66,00

 

III

TERMINALS ALONG NHA BE RIVER

20 / 1.876

30.000

134,12

 

21,6

30.000 DWT

21 / 2.451

149,11

23,2

30.000 DWT

23 / 3,151

165,47

243

30.000 DWT

24 / 3.601

165,47

 

1

Phu Thuan Passenger Terminal

 

 

 

International passenger terminal

 

50.000­ -60.0000 GRT

1 / 300

4,60

 

50.000­ -60.0000 GRT

2 / 600

4,60

 

50.000 - 60.0000 GRT

2 / 600

4,60

To be developed within bridge clearance

2

Navioil Terminal

1 / 174

10,000

15,80

Dedicated terminal

1,20

10.000

1 / 174

15,80

1,20

10.000

1 / 174

15,80

1,20

10.000

1 / 174

15,80

 

3

Shipmarine Shipyard Terminal

1 / 100

6.500

6,00

Dedicated to shipbuilding and ship repair

0,20

6.500

1 / 100

6,00

0,20

6.500

1 / 100

6,00

0,20

6.500

1 / 100

6,00

 

4

An Phu Shipyard Terminal

1 / 50

5.000

5,00

Dedicated to shipbuilding and ship repair

0,10

5.000

1 / 50

5,00

0,10

5.000

1 / 50

5,00

0,10

5.000

1 / 50

5,00

 

5

Terminal of Waterways College II

1/ 27

300

1,97

Dedicated terminal

 

300

1 / 27

1,97

 

300

1 / 27

1,97

 

300

1 / 27

1,97

 

6

Minh Tan Oil terminal

1 / 30

1.000

 

Oil terminal

0,10

1.000

1 / 30

 

0,10

1.000

1 / 30

 

0,10

1.000

1 / 30

 

 

7

Nha Be Multipurpose Terminal

 

 

 

Multipurpose and dedicated terminal

 

 

 

 

1,60

30.000

1 / 400

16,36

3,20

30.000

2 / 850

16,36

 

8

Nha Be Central Oil terminal

8 / 740

25.000­ -30.000

94,00

Oil terminal

12,00

25.000­ -30.000

8 / 740

94,00

12,00

25.000- 30.000

8 / 740

94,00

12,00

25.000­30.000

8 / 740

94,00

 

9

PV OIL Terminal

2 / 54

25.000

 

Oil terminal

0,50

 

 

 

0,50

 

 

 

0,50

 

 

 

 

10

Petechim Terminal

2 / 325

5.000-25.000

8,90

Oil terminal

4,50

5.000 - 25.000

2 / 325

8,90

4,50

5.000­ - 25.000

2 / 325

8,90

4,50

5.000­ - 25.000

2 / 325

8,90

 

11

VK 102 Terminal

1 / 196

10.000

 

Oil terminal

1,2

40.000

1 / 250

 

1,2

40.000

1 / 250

 

1,2

40.000

1 / 250

 

 

Thanh Le Terminal

 

 

 

0,9

4.000

1 / 87

 

0,9

4.000

1 / 87

 

0,9

4.000

1 / 87

 

 

12

Oil terminal of Lam Tai Chinh Ltd.

1 / 60

15.000

2,45

Oil terminal

0,90

15.000

1 / 60

2,45

0,90

15.000

1 / 60

2,45

0,90

15.000

1 / 60

2,45

 

13

Aviation Oil terminal (Hang Khong Oil terminal)

 

 

 

Oil terminal

 

15.000

1 / 188

10,39

 

15.000

1 / 188

10,39

 

15.000

1 / 188

10,39

 

14

Terminal of Shipyard X51

1 / 120

10.000

 

Dedicated to shipbuilding and ship repair

 

10.000

1 / 120

 

10.000

1 / 120

 

0,00

10.000

1 / 120

 

 

 

IV

TERMINALS ALONG SOAI RAP RIVER

12 / 2307

30.040

158,81

 

36,26

30.000­ -80.000

20 / 4.527

256,21

55,96

30.000­ -80.000

28 / 5.857

333,8

62,46

30.000­ -80.000

31 / 6.511

375,3

 

1

Multipurpose Terminal

 

 

 

Multipurpose terminal

 

 

 

 

2,15

30.000

1 / --

9,18

2,15

30.000

1 / --

9,18

Suitable for Binh Khanh bridge

2

Terminal of Cotec Cement Grinding Station

1 / 70

15.000

3,70

Cement terminal

0,50

15.000

1 / 70

3,70

0,50

15.000

1 / 70

3,70

0,50

15.000

1 / 70

3,70

 

3

Terminal of Thang Long Cement Grinding Station

1 / 179

15.000

10,26

Cement terminal

1,41

15.000

1 / 179

10,26

1,41

15.000

1 / 179

10,26

1,41

15.000

1 / 179

10,26

 

4

Terminal of Fico Cement Grinding Station

1 / 200

20.000

10,26

Cement terminal

1,50

20.000

1 / 200

10,26

1,50

20.000

1 / 200

10,26

1,50

20.000

1 / 200

10,26

 

5

Terminal of Chifon Cement Grinding Station

1 / 179

20.000

11,33

Cement terminal

1,20

20.000

1 / 179

11,33

1,20

20.000

1 / 179

11,33

1,20

20.000

1 / 179

11,33

 

6

Tan Cang Hiep Phuoc Terminal

/

 

 

Multipurpose terminal

3,20

50.000

2 / 420

15,40

3,20

50.000

2 / 420

15,40

3,20

50.000

2 / 420

15,40

 

7

Terminal of Hiep Phuoc Power Plant

1 / 300

30.000

45,50

Oil terminal

0,53

30.000

1 / 300

45,50

0,53

30.000

1 / 300

45,50

0,53

30.000

1 / 300

45,50

 

8

Nghi Son Cement terminal

1 / 204

20.000

7,90

Cement terminal

0,89

20.000

1 / 204

7,90

0,89

20.000

1 / 204

7,90

0,89

20.000

1 / 204

7,90

 

9

Saigon Premier Container Terminal

2 / 500

30.000

23,00

Container terminal

8,80

50.000

2 / 500

40,00

16,50

50.000

4 / 950

40,00

16,50

50.000

4 / 950

40,00

 

10

Calofic Terminal

1 / 159

20.000

 

Dedicated terminal

0,20

20.000

1 / 159

 

0,20

20.000

1 / 159

 

0,20

20.000

1 / 159

 

 

11

Terminal of Tico Detergent Factory

1 / 146

10.000- 15.000

 

Oil terminal

0,80

10.000- 15.000

1 / 146

3,00

0,80

10.000- 15.000

1 / 146

3,00

0,80

10,000- 15.000

1 / 146

3,00

 

12

Terminal of Ha Long Cement Grinding Station

1 / 170

15.000

10,80

Cement terminal

1,41

15.000

1 / 170

10,80

1,41

15.000

1 / 170

10,80

1,41

15.000

1 / 170

10,80

 

13

Multipurpose Terminal

 

 

 

Multipurpose terminal

 

 

 

 

1.60

30.000- 50.000

2 / 320

11,60

1,60

30,000- 50.000

2 / 320

11,60

 

14

Multipurpose terminal (Tan Thuan Dong terminal is to be relocated)

 

 

 

Multipurpose terminal

1,00

30.000- 50.000

1 / 200

12,00

1.00

30.000- 50.000

1 / 200

12,00

3,75

30.000- 50.000

2 / 354

23.50

 

15

Sai Gon - Hiep Phuoc Terminal

1 / 200

50.000

36,06

Multipurpose terminal

9,82

50.000

3 / 800

36,06

9,82

50.000

3 / 800

36,06

9,82

50.000

3 / 800

36,06

 

16

Sai Gon Hiep Phuoc Logistics Center

 

 

 

Multipurpose terminal

 

 

 

 

 

1.000-3.000

1 / 60

16,81

 

1.000-3.000

1 / 60

16,81

 

17

Hiep Phuoc Downstream Zone

 

 

 

Multipurpose terminal

5,00

30.000-50.000

3 / 1.000

50,00

13,25

30.000-80.000

5 / 1.500

90,00

17,00

30.000-80.000

7 / 2.000

120,0

 

V

TERMINALS ALONG SOAI RAP RIVER IN LONG AN PROVINCE

1 / 205

20.000

26

 

5,9

10.000- 75.000

3 / 663

96

18,45

10.000- 75.000

7 / 1.353

216,73

24,8

10.000- 75.000

12 / 2.603

301,7

 

1

Potential terminals downstream of Chim Tren channel (Long An)

 

 

 

Multipurpose terminal

 

 

 

 

 

 

 

 

 

 

 

 

Potential terminal

2

VinaBenny Energy Terminal

 

 

 

Oil terminal

3,00

10.000-75.000

1 / 290

60,00

6,00

10.000- 75.000

3 / 560

120,00

6,00

10.000-75.000

3 / 560

120,00

 

3

Long An International Terminal

 

 

 

Multipurpose terminal

 

 

 

 

9,55

30.000-50.000

2 / 420

60,73

15,90

30.000-50.000

7 / 1.670

145,70

 

4

Luks Cement Terminal

 

 

 

Cement terminal

1,40

20.000

1 / 168

10,00

1,40

20.000

1 / 168

10,00

1,40

20.000

1 / 168

10,00

 

5

Phuc Son Cement Terminal

1 / 205

20.000

26,00

Cement terminal

1,50

20.000

1 / 205

26,00

1,50

20.000

1 / 205

26,00

1,50

20.000

1 / 205

26,00

 

6

Terminal upstream of Cat channel

 

 

 

Multipurpose terminal

 

 

 

 

 

 

 

 

 

 

 

 

Potential

 

TOTAL

105 / 16.909

 

715,23

 

146,5

 

92 / 16.417

868,64

180,35

 

106 / 19.137

1.083

203,25

 

113 /21.991

1.246

 

Note: Schedule for investment in the terminals varies according to estimated need for goods movement.

B. DONG NAI SEAPORT

No.

Name

Condition

Class

Estimation (Planning)

Note

Quantity (pcs)/Total length (m) of wharves

Size of ship
(DWT)

Area (hectares)

By 2020

By 2025

By 2030

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

I

TERMINALS ALONG DONG NAI RIVER

5 / 592

5.000

15,82

 

736

5.000 - 30.000

8 / 1.232

48,92

19,79

5.000 -30.000

15 / 2.862

147,62

28,39

5.000 - 30.000

19 / 3.662

199,86

 

1

Dong Nai Terminal

3 / 170

2.000 - 5.000

8,33

Multipurpose terminal

2,80

5,000

5 / 460

17,13

2,80

5.000

5 / 460

17,13

2,80

5.000

5 / 460

17,13

 

2

SCT Gas Vietnam Terminal

1 / 302

1.000

3,00

Gas terminal

0,03

1.000

1 / 302

3,00

0,03

1.000

1 / 302

3,00

0,03

1.000

1 / 302

3,00

 

3

VT Gas Terminal

1 / 120

1.000

4,49

Oil terminal

0,13

1,000

1 / 120

4,49

0,21

1.000

2 / 200

4,49

0,21

1.000

2 / 200

4,49

 

4

Viet Thuan Thanh Multipurpose Terminal

 

 

 

Multipurpose, container terminal

4,40

30.000

1 / 350

24,30

7,15

30.000

2 / 600

35,00

12,50

30.000

5 / 1.100

69,24

 

5

Phu Huu Multipurpose Terminal (Terminal 1)

 

 

 

Multipurpose terminal

 

 

 

 

3,25

30,000

1 / 300

17,00

3,25

30.000

1 / 300

17,00

 

6

Phu Huu Multipurpose Terminal (Terminal 2)

 

 

 

Multipurpose terminal

 

 

 

 

1,60

30.000

1 / 300

16,50

1,60

30.000

1 / 300

16,50

 

7

Phu Huu Multipurpose Terminal (Terminal 3)

 

 

 

Multipurpose terminal

 

 

 

 

 

 

 

 

3,25

30.000

1 / 300

18,00

 

8

Phu Huu Multipurpose Terminal (Terminal 4 – Tin Nghia Terminal)

 

 

 

Multipurpose terminal

 

 

 

 

3,25

30.000

1 / 300

20,00

3,25

30.000

1 / 300

20,00

 

9

Tin Nghia Oil terminal

 

 

 

Oil terminal

 

 

 

 

1,50

30.000

2 / 400

34,50

1,50

30.000

2 / 400

34,50

 

II

TERMINALS ALONG NHA BE RIVER

2 / 366

25.000

22,30

 

4,35

30.000

5 / 846

70,82

8,35

30.000

9 / 1.896

134,82

14,25

30.000

13 / 3.106

203,32

 

1

Minh Tan Oil Terminal

 

 

 

Oil terminal

1,50

30.000

2 / 400

30,52

1,50

30.000

2 / 400

30,52

1,50

30.000

2 / 400

30,52

 

2

Phu Huu – Duc Tai Thinh Multipurpose Terminal

 

 

 

Multipurpose terminal

0,00

 

 

 

0,00

 

 

 

1,20

30.000

1 / 350

21,00

 

3

Oil Terminal of Logistics Administration (Tổng Cục Hậu Cần)

 

 

 

Oil terminal

0,00

 

 

 

2,00

30,000

2 / 500

25,00

2,00

30.000

2 / 500

25,00

 

4

Oil Terminals of Vinalines

 

 

 

Oil terminal

0,00

 

 

 

0,00

 

 

 

2,00

30.000

2 / 500

25,00

 

5

Phu Huu Multipurpose Terminal (Terminal 6 – Phu Thien Phat Terminal)

 

 

 

Multipurpose terminal

0,00

 

 

 

2,00

30.000

2 / 550

39,00

2,00

30.000

2 / 550

39,00

 

6

Vinh Hung Terminal

 

 

 

Dedicated/Multipurpose terminal

 

 

 

 

2,70

30.000

1 / 360

22,50

2,70

30.000

1 / 360

22,50

 

7

Phu Dong Timber Terminal

1 / 146

25.000

9,30

For timber

0,30

25.000

1 / 146

9,30

0,30

25.000

1 / 146

9,30

0,30

25.000

1 / 146

9,30

 

8

Comeco Oil Terminal

 

 

 

Oil terminal

0,95

25.000

1 / 80

18,00

0,95

25.000

1 / 80

18,00

0,95

25.000

1 / 80

18,00

 

9

Phuoc Khanh Oil Terminal

1 / 220

25.000

13,00

Oil terminal

1,60

25.000

1 / 220

13,00

1,60

25.000

1 / 220

13,00

1,60

25.000

1 / 220

13,00

 

III

TERMINALS ALONG LONG TAU RIVER

5 / 976

30.000

39,65

 

3,40

30.000

9 / 1.938

138,52

6,60

30.000

11 / 2.933

196,08

18,80

30.000

18 / 4.472

360,01

 

1

Terminal of Shipyard 76

 

 

 

Dedicated to shipbuilding and ship repair

0,00

 

 

 

0,00

 

 

 

0,00

 

 

 

To be invested in when appropriate

2

Phu Huu  1 Multipurpose Terminal

 

 

 

Multipurpose terminal

1.00

30.000

1 / 250

17,50

1,00

30.000

1 / 250

17,50

6,40

30.000

3 / 650

35,00

 

3

Phuoc Khanh Multipurpose Terminal (Terminal 1 – Vamco Biochemical Terminal)

 

 

 

Multipurpose terminal

0,00

 

 

 

0,00

 

 

 

1,00

30.000

1 / 250

22,30

 

4

Phuoc Khanh Multipurpose Terminal

 

 

 

Multipurpose terminal

0,00

 

 

 

 

 

 

 

3,30

30.000

1 / 200

15,00

 

5

Phuoc Khanh Multipurpose Terminal (Terminal 3 – Phuc Thanh Terminal)

 

 

 

Multipurpose terminal

 

 

 

 

 

 

 

 

1,00

30.000

1 / 250

10,00

 

6

Maritime Consultancy Center

 

 

 

Maritime services

0,00

 

 

25,35

0,00

 

 

25,35

0,00

 

 

25,35

 

7

Terminal of Cau Kien Be Tong Company

 

 

 

Dedicated terminal

0,50

15,000

1 / 270

9,56

0,50

15.000

1 / 270

9,56

0,50

15.000

1 / 270

9,56

 

8

Cong Thanh Cement Terminal

 

 

 

Cement terminal

0,60

30.000

1 / 230

17,73

0,60

30.000

1 / 230

17,73

0,60

30.000

1 / 230

17,73

 

9

Lafarge Cement Terminal

1 / 201

30.000

6,38

Cement terminal

0,60

30.000

1 / 201

6,38

0,60

30.000

1 / 201

6,38

0,60

30.000

1 /201

6,38

 

10

Terminal of Hi-tech Shipyard

 

 

 

Dedicated to shipbuilding and ship repair

0,00

 

 

20,30

0,00

 

 

20,30

0,00

 

 

20,30

 

11

Multipurpose Terminal of Ong Keo Industrial Park (Tin Nghia Terminal)

 

 

 

Multipurpose terminal

 

 

 

 

2,70

30.000

1 / 265

17,56

2,70

30.000

1 / 265

17,56

 

12

Bao Tin Dedicated Terminal

 

 

 

Dedicated terminal

-

30.000

1 / 212

8,43

-

30,000

1 / 212

8,43

0,00

30.000

1 / 212

8,43

 

13

LPG Terminal of Hong Moc Private Enterprise

1 / 207

5.000

5,61

Oil terminal

0,20

5.000

1 / 207

5,61

0,20

5.000

1 / 207

5,61

0,20

5.000

1 / 207

5,61

 

14

Tram Anh Lubricant Terminal

1 / 238

30.000

11,69

Oil terminal

0,20

30.000

1 / 238

11,69

0,20

30.000

1 / 238

11,69

0,20

30,000

1 / 238

11,69

 

15

Terminal of AP Petrochimical Vietnam Ltd.

1 / 150

15.000

8,71

Oil terminal

0,15

15.000

1 / 150

8,71

0,15

15.000

1 / 150

8.71

0,15

15.000

1 / 150

8,71

 

16

Viko Wochimex Timber Terminal

1 / 180

15.000

7,26

For wood chips

0,15

15.000

1 / 180

7,26

0,15

15.000

1 / 180

7,26

0,15

15.000

1 / 180

7,26

 

17

Terminal of Sunsteel factory

 

 

 

Steel terminal

0,00

 

 

 

0,50

30.000

1 / 200

40,00

2.00

30.000

3 / 639

139,13

 

18

Potential dedicated Terminal

 

 

 

Dedicated terminal

0,00

 

 

 

0,00

30.000

/ 530

 

0,00

30.000

/ 530

 

 

IV

TERMINALS ALONG THI VAI RIVER

8 / 953

15.000

188,90

 

7,73

30.000­ -60.000

10 / 1.532

200,70

11,58

30.000­ -60.000

14 / 2.195

225,70

18,63

30.000­ -60.000

16 / 2.810

268,20

 

1

Phuoc Thai Multipurpose Terminal (Terminal 1)

 

 

 

Multipurpose terminal

0,00

 

 

 

0,00

 

 

 

0,00

 

 

 

To be invested after 2030

2

Go Dau Multipurpose Terminal

 

 

 

Multipurpose terminal

0,00

 

 

 

0,00

 

 

 

0,00

 

 

 

To be invested after 2030

3

Phuoc Thai Terminal (Vedan)

2 / 340

10.000­ -12.000

120,00

Dedicated terminal

1,13

10.000­ -12.000

2 / 340

120,00

1,13

10.000­ -12.000

2 / 340

120,00

1,13

10.000- 12.000

2 / 340

120,00

 

4

Dong Nai Terminal (Go Dau A Terminal)

1 / 170

2.000

17,60

Multipurpose terminal

1,00

5.000­ -10.000

1 / 170

17,60

1,00

5.000­ -10.000

3 / 350

17,60

1,00

5.000­ -10.000

3 / 350

17,60

 

5

Super Phosphate Long Thanh Terminal

1 / 50

3.000

11,30

For fertilizers and chemicals

0,30

3,000

1 / 50

11,30

0,30

3.000

1 / 50

11,30

0,30

3.000

1 / 50

11,30

 

6

Terminal of Unique Gas factory

1 / 130

6.500

1,80

Gas terminal

0,20

6.500

1 / 130

1,80

0,20

6.500

1 / 130

1,80

0,20

6.500

1 / 130

1,80

 

7

Dong Nai Terminal (Go Dau B Terminal)

3 / 263

6.500­ - 15.000

38,20

Multipurpose terminal

5,10

30.000

5 / 842

50,00

5,10

30.000

6 / 990

50.00

5,10

30.000

6 / 990

50,00

 

8

Phuoc An Multipurpose Terminal

 

 

 

Multipurpose, container terminal

0,00

 

 

 

3,85

60.000

1 / 335

25,00

10,90

60.000

3 / 950

67,50

 

 

TOTAL

20 / 2.887

 

266,67

 

22,83

 

32 / 5348

458,96

46,31

 

49 / 9.886

704,22

80,06

 

66 / 14.050

1.031,39

 

Note: Schedule for investment in the terminals varies according to estimated need for goods movement.

C. BINH DUONG SEAPORT

No.

Name

Condition

Class

Estimation (Planning)

Note

Quantity (pcs)/Total length (m) of wharves

Size of ship
(DWT)

Area (hectares)

By 2020

By 2025

By 2030

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

1

Binh Duong Terminal

1 / 110

1.000-5.000

7,30

Multipurpose terminal

1,21

1.000-5.000

1 / 110

7.30

1,21

1.000-5.000

1 / 110

7,30

1,21

1.000-5.000

1 / 110

7,30

 

D. VUNG TAU SEAPORT

No.

Name

Condition

Class

Estimation (Planning)

Note

Quantity (pcs)/Total length (m) of wharves

Size of ship
(DWT)

Area (hectares)

By 2020

By 2025

By 2030

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

Capacity (million tonnes)

Size of ship
(DWT)

Quantity (pcs)/Total length (m) of wharves

Area (hectares)

I

TERMINALS ALONG CAI MEP - THI VAI RIVER

32/ 8.511

80.000
(160.000)

502,72

 

139,02

30.000-80.000 (200.000)

548 / 13.177

940,89

164,92

30.000-80.000 (200.000)

57 / 14.607

1.053,07

208,12

30.000-80.000 (200.000)

70 / 17.999

1325,76

 

1

Terminal of Cam Pha Cement Grinding Station

1 /186

15.000

9,17

Cement terminal

1,87

15.000

1 / 186

9,17

1,87

15.000

1 / 186

9,17

1,87

15.000

1 / 186

9,17

 

2

My Xuan A Terminal

 

 

 

Multipurpose terminal

 

 

 

 

 

 

 

 

2,50

15.000

3 / 600

32,50

 

3

Terminal of My Xuan Cement Grinding Station

 

 

 

Dedicated terminal

 

 

 

 

1,50

30.000

2 / 330

16,35

1,50

30,000

2 / 330

16,35

 

4

Sai Gon – Thep Viet Terminal

 

 

 

Steel terminal

1,50

30.000

1 / 200

17,00

3,50

30.000

2 / 400

33,83

3,50

30,000

2 / 400

33,83

 

5

Hong Quang Multipurpose Terminal

 

 

 

Multipurpose terminal

 

 

 

 

 

 

 

 

3,20

30.000

2 / 395

39,69

 

6

Sao Bien International Terminal

 

 

 

Multipurpose, container terminal

2,70

30.000

1 / 300

68,02

2,70

30.000

1 / 300

68,02

2,70

30.000

1 / 300

68,02

 

7

Terminal of Vinalines Shipyard

 

 

 

Dedicated to shipbuilding and ship repair

 

 

 

 

 

 

 

 

 

 

 

 

To be invested in when appropriate

8

My Xuan multipurpose and container terminal

 

 

 

Multipurpose, container terminal

 

 

 

 

1,50

50.000

1 / 300

25,00

5,90

50.000

2 / 700

50,30

 

9

My Xuan International Multipurpose Terminal

 

 

 

Multipurpose, container terminal

2,60

60.000

2 / 463

62,00

2,60

60.000

2 / 463

62,00

16,10

60.000

4 / 1.100

172,00

 

10

Oil Terminal of Phu My Power Plant

2 /412

10.000

8,59

Oil terminal

4,00

10.000

2 / 412

8,59

4,00

10.000

2 / 412

8,59

4,00

10.000

2 / 412

8,59

 

11

Terminal of Thi Vai Cement Grinding Factory (Holcim)

1 /246

50.000

18.00

Cement terminal

1,50

50.000

1 / 246

18,00

1,50

50.000

1 / 246

18,00

1,50

50.000

1 / 246

18,00

 

12

Saigon International Terminals –Vietnam (SITV)

3 /728

60.000

33,73

Container terminal

12,10

60.000

3 / 728

33,73

12,10

60.000

3 / 728

33,73

12,10

60.000

3 / 728

33,73

 

13

Thi Vai International Terminal (invested before steel terminal)

 

 

 

Multipurpose terminal

1,00

10.000-30.000

1 / 220

15.00

1,00

10.000-30.000

1 / 220

15,00

6,90

10.000-30.000

3 / 680

41,00

Multipurpose terminal to be invested after 2020

14

Phu My – Ba Ria Serece Terminal

2 /700

60.000

23,03

Multipurpose terminal

7,00

10.000­ - 80.000

4 / 700

23,03

7,00

10.000­- 80.000

4 / 700

23,03

7,00

10.000­ - 80.000

4 / 700

23,03

 

15

PTSC Phu My Terminal

2/384

30.000

27,46

Multipurpose terminal

3,00

10.000-30.000

1 / 384

27,46

3,00

10.000-30,000

1 / 384

27,46

3,00

10,000-30.000

1 / 384

27,46

 

16

Terminal of Phu My Steel Factory

1 /230

50.000

22,00

Steel terminal

1,30

50.000

2 / 420

22,00

1,30

50.000

2 / 420

22,00

1,30

50.000

2 / 420

22,00

 

17

Cai Mep – Thi Vai International Terminal

2 / 600

75.000

 

Multipurpose terminal

3,00

75.000

2 / 600

27,00

3,00

75.000

2 / 600

27,00

3,00

75.000

2 / 600

27,00

 

18

SP-PSA International Terminal

2 / 600

50.000­80.000

28,20

Container terminal

8.80

80.000 (120.000)

2 / 600

28,20

8,80

80.000 (120.000)

2 / 600

28,20

16,50

80.000 (120.000)

4 / 1.200

56,40

 

19

Posco Terminal

1 / 333

45.000

15,09

Steel terminal

2,86

50.000

1 / 333

15,09

2,86

50.000

1 / 333

15,09

2,86

50.000

1 / 333

15,09

 

20

Posco SS Terminal

 

 

 

Steel terminal

1,75

50.000

1 / 267

12,61

1,75

50.000

1 / 267

12,61

1,75

50.000

1 / 267

12,61

 

21

Ban Thach Multipurpose Terminal

 

 

 

Multipurpose terminal

 

 

 

 

 

 

 

 

 

 

 

 

To be invested after 2030

22

Terminals of Ba Son Shipyard

 

 

 

Dedicated to shipbuilding and ship repair

1,50

70.000-150.000

4 / 700

73,50

1,50

70.000-150.000

4 / 700

73,50

1,50

70.000-150.000

4 / 700

73,50

 

23

Interflour Terminal

1 / 308

75.000

7,57

For farm produce

1,80

75.000

1 / 308

24,00

1,80

75.000

1 / 308

24.00

1,80

75.000

1 / 308

24.00

 

24

Tan Cang Cai Mep Container Terminal

3 / 890

80.000

61,18.

Container terminal

16,50

80.000 (110.000)

3 / 890

61,18

16,50

80.000 (110.000)

3 / 890

61,18

16,50

80.000 (110.000)

3 / 890

61,18

 

25

Hoa Sen – Gemadept International Terminal

 

 

 

Multipurpose, container terminal

4,10

30.000-50.000

1 / 286

6,81

4,10

30.000-50.000

1 / 286

6,81

4,10

30.000-50.000

1 / 286

6,81

 

26

Cai Mep LGP Terminal

2 / 362

2.000-30.000

40,00

For LPG and condensate

1,30

2.000-30.000

2 / 362

40,00

1,30

2.000-30.000

2 / 362

40,00

1,30

2.000-30.000

2 / 362

40,00

 

27

Petec Cai Mep Oil Terminal

2 / 452

5.000-60.000

31,60

Oil terminal

5,00

5.000-60.000

2 / 452

31,60

5,00

5.000-60.000

2 / 452

31,60

5,00

5.000-60.000

2 / 452

31,60

 

28

Cai Mep Oil Terminal

1 /280

80.000

20,60

Oil terminal

1,38

80.000

1 / 280

20,60

1,38

80.000

1 / 280

20,60

1.38

80.000

1 / 280

20,60

 

29

LDC - VTSC Terminal

 

 

 

Multipurpose terminal

3,60

80.000

1 / 290

13,20

3,60

80.000

1 / 290

13,20

3,60

80.000

1 / 290

13,20

 

30

Cai Mep International Terminal (CMIT)

2 / 600

80.000 (160.000)

48,00

Container

12,65

80.000 (160.000)

2 / 600

48,00

12,65

80.000 (160.000)

2 / 600

48,00

12,65

80.000 (160,000)

2 / 600

48,00

 

31

Cai Mep – Thi Vai International Terminal

2 / 600

80.000­ 100.000

48,00

Container terminal

8,14

80.000- 100.000

2 / 600

48,00

8,14

80.000­100.000

2 / 600

48,00

8.14

80.000­ 100.000

2 / 600

48,00

 

32

SP-SSA International Container Terminal

2 / 600

80.000 (160.000)

60,50

Container terminal

17,27

80.000 (160.000)

2 / 600

60,50

17,27

80.000 (160.000)

2 / 600

60,50

17,27

80.000 (160.000)

2 / 600

60,50

 

33

Gemalink Container Terminal

 

 

 

Container terminal

8,80

80.000 (200.000)

500 / 1.150

71,60

18,70

80.000 (200.000)

3 / 1.150

71,60

18,70

80.000 (200.000)

3 / 1.150

71,60

 

34

Cai Mep Ha Multipurpose and Container Terminal

 

 

 

Multipurpose terminal

1,00

80.000 (160.000)

1 / 300

35,00

6,50

80.000 (160.000)

2 / 600

69,00

12,50

80.000 (160.000)

3 / 900

80,00

 

35

Cai Mep Downstream Terminal

 

 

 

Container terminal

1.00

80.000­200.000

1 / 300

20,00

6,50

80.000-200.000

2 / 600

40,00

6,50

80.000­ - 200.000

2 / 600

40,00

 

II

TERMINALS ALONG DINH RIVER ANH GANH RAI BAY

28 / 3.519

10.000

133,25

 

17,35

80.000 DWT

32 / 5.039

297,25

20,15

80.000 DWT

36 / 5.739

337,25

21,05

80.000 DWT

36 / 5.421

317,25

 

1

Cat Lo Commercial Terminal

2 / 310

1.000-5.000

5,40

Multipurpose and fish terminal

1,00

1.000-5.000

2 / 310

5,40

1,00

1.000-5.000

2 / 310

5,40

1,00

1.000-5.000

2 / 310

5,40

 

2

K2 Oil Terminal

1 /162

5.000

0,12

Oil terminal

0,40

5.000

1 / 162

0,12

0,40

5.000

1 / 162

0,12

0,40

5.000

1 / 162

0,12

 

3

Terminal of Dong Xuyen Industrial Park

 

 

 

Multipurpose terminal

 

 

 

 

 

 

 

 

 

 

 

 

 

-

Multipurpose Terminal

 

 

 

Multipurpose terminal

 

 

 

 

1.30

5.000-10.000

3 / 400

20,00

1,30

5.000-10.000

3 / 400

20,00

 

-

Vina Offshore Terminal

1 / 158

10.000

1,82

Dedicated terminal

0,10

10.000

1 / 158

1,82

0,10

10.000

1 / 158

1,82

0,10

10.000

1 / 158

1,82

 

-

Terminal Thang Loi Oil Ltd.

1 / 156

10.000

2,00

Oil terminal

0,30

10.000

1 / 156

2,00

0,30

10.000

1 / 156

2,00

0,30

10.000

1 / 156

2,00

 

-

Terminal of Sai Gon Shipyard and Maritime Mechanics Ltd.

1 / 100

10.000

13,40

Dedicated to shipbuilding and ship repair

0,20

10.000

1 / 100

13,40

0.20

10,000

1 / 100

13,40

0,20

10.000

1 / 100

13,40

 

4

VietsovPetro Terminal

10 / 1.377

10.000

53,05

For petroleum services

5,00

10.000

10 / 1.377

53,05

5,00

10.000

10 / 1.377

53.05

5,00

10.000

10 / 1.377

53,05

 

5

PTSC Petroleum service terminal

9 / 820

5.000-10.000

21,80

For petroleum services

0,75

5.000-10.000

10 / 1.036

35,80

0,75

5.000-10.000

10 / 1.036

35,80

0,75

5.000-10.000

10 / 1.036

35,80

 

 

Cu Lao Tao Oil Terminal

1 / 133

10.000

27,16

Oil terminal

0,50

10.000

1 / 138

27,16

0,50

10.000

1 / 138

27,16

0,50

10.000

1 / 138

27,16

 

6

Sao Mai – Ben Dinh Petroleum Service Center

 

 

 

For petroleum services

-

20.000

/ 1063

98

-

20.000

/ 1063

98

-

20.000

/ 1063

98

 

 

PV Shipyard Terminal

1 /156

15.000

6,20

For building, repairing ships and oil rigs

0,10

15.000

1 / 156

6,20

0,10

15.000

1 / 156

6,20

0,10

15.000

1 / 156

6,20

 

 

PVC-MS Terminal

1 /142

10.000

2,30

For petroleum services

0,10

10.000

1 / 142

2,30

0,10

10.000

1 / 142

2,30

0,10

10.000

1 / 142

2,30

 

 

Sao Mai – Ben Dinh Petroleum Service Wharf

 

 

 

 

-

20.000

1 / 508

35

-

20.000

1 / 508

35

--

20.000

1/508

35

To be repurposed

7

Vung Tau Container Terminal

 

 

 

Container terminal

 

 

 

 

 

 

 

 

 

 

 

 

To be invested after 2030

8

Potential terminal

 

 

 

Container terminal

 

 

 

 

 

 

 

 

 

 

 

 

Potential

9

Passenger terminal and tourism service complex

 

 

 

International passenger terminal

 

50.000­100.000 GRT

 

 

 

50.000­100.000 GRT

 

 

 

50.000­100.000 GRT

 

 

To be established in Bai Truoc area

10

Terminal of Long Son Industrial Service Center

 

 

 

Multipurpose and dedicated terminal

1,20

10.000

2 / 296

20,00

1,20

10.000

2 / 296

20,00

2.10

20.000

3 / 486

 

 

11

Terminal of Long Son Shipyard

 

 

 

Dedicated to shipbuilding and ship repair

1,00

5.000-30.000

/ 500

95,00

1,00

5.000-30.000

500

95,00

1,00

5.000-30.000

/ 500

95,00

 

12

Terminals of Long Son Petrochemical Complex

 

 

 

Dedicated terminal

6,70

1.500-100.000

 

 

6,70

1.500-100.000

 

 

6,70

1.500-100.000

 

 

 

13

Long Son Multipurpose Terminal

 

 

 

Multipurpose terminal

 

 

 

 

1,50

80.000

1 / 300

20,00

1,50

80.000

1 / 300

20,00

 

III

CON DAO TERMINALS

3 / 242

10.000DWT 50.000GRT

3

 

0,03

10.000- 30.000DWT 50.000GRT

4 / 442

7,70

0,03

10.000-30.000DWT
50.000GRT

5 / 670

15,20

0,03

10.000-30.000DWT
50.000GRT

5 / 670

15,20

 

1

Ben Dam Terminal

3 / 242

10.000DWT 50.000GRT

2,70

Multipurpose and passenger terminal

0,03

10.000-30.000DWT
50.000GRT

3 / 242

2,70

0,03

10.000-30.000DWT
50.000GRT

3 / 242

2.70

0,03

10.000-30.000DWT
50.000GRT

3 / 242

2,70

 

2

Maritime and petroleum service terminal

 

 

 

Multipurpose terminal

 

30.000

1 / 200

5,00

 

30.000

2 / 428

12,50

 

30.000

2 / 428

12,50

 

3

LNG Con Dao Terminal

 

 

 

Dedicated terminal

 

 

 

 

 

 

 

 

 

 

 

 

Under consideration

 

TOTAL

63 / 12.272

 

638,67

 

156,4

 

584 18.658

1.246

185,1

 

98 / 21.016

1.406

229,2

 

111 / 24.090

1.658

 

Note: Schedule for investment in the terminals varies according to estimated need for goods movement.

Đã xem:

Đánh giá:  
 

Thuộc tính Văn bản pháp luật 3327/QD-BGTVT

Loại văn bảnQuyết định
Số hiệu3327/QD-BGTVT
Cơ quan ban hành
Người ký
Ngày ban hành29/08/2014
Ngày hiệu lực29/08/2014
Ngày công báo...
Số công báo
Lĩnh vựcGiao thông - Vận tải, Xây dựng - Đô thị
Tình trạng hiệu lựcCòn hiệu lực
Cập nhật10 năm trước
Yêu cầu cập nhật văn bản này

Download Văn bản pháp luật 3327/QD-BGTVT

Lược đồ Decision 3327/QD-BGTVT approval for detailed planning seaports southeast 2020 2014


Văn bản bị sửa đổi, bổ sung

    Văn bản sửa đổi, bổ sung

      Văn bản bị đính chính

        Văn bản được hướng dẫn

          Văn bản đính chính

            Văn bản hiện thời

            Decision 3327/QD-BGTVT approval for detailed planning seaports southeast 2020 2014
            Loại văn bảnQuyết định
            Số hiệu3327/QD-BGTVT
            Cơ quan ban hànhBộ Giao thông vận tải
            Người kýĐinh La Thăng
            Ngày ban hành29/08/2014
            Ngày hiệu lực29/08/2014
            Ngày công báo...
            Số công báo
            Lĩnh vựcGiao thông - Vận tải, Xây dựng - Đô thị
            Tình trạng hiệu lựcCòn hiệu lực
            Cập nhật10 năm trước

            Văn bản thay thế

              Văn bản được dẫn chiếu

                Văn bản hướng dẫn

                  Văn bản được hợp nhất

                    Văn bản gốc Decision 3327/QD-BGTVT approval for detailed planning seaports southeast 2020 2014

                    Lịch sử hiệu lực Decision 3327/QD-BGTVT approval for detailed planning seaports southeast 2020 2014

                    • 29/08/2014

                      Văn bản được ban hành

                      Trạng thái: Chưa có hiệu lực

                    • 29/08/2014

                      Văn bản có hiệu lực

                      Trạng thái: Có hiệu lực