DECISION

RATIFYING THE GENERAL PLANNING FOR THE NEW DIEN NAM - DIEN NGOC URBAN CENTER IN QUANG NAM PROVINCE

THE PRIME MINISTER

Pursuant to the Law on Organization of the Government of September 30, 1992;
Pursuant to the Regulation on the management of urban planning issued together with Decree No. 91/CP of August 17, 1994 of the Government;
At the proposal of the President of the People
s Committee of Quang Nam province in report No. 258/TT-UB of March 19, 1998 and of the Minister of Construction in Official Dispatch No. 2213/BXD-KTQH of December 22, 1998;

DECIDES:

Article 1- To approve the General Planning for the new Dien Nam - Dien Ngoc urban center up to 2020 with the following main contents:

1. On the objective:

The General Planning for the new Dien Nam - Dien Ngoc urban center aims to concretize the orientation of the general planning for urban development of Vietnam up to the year 2020, to support the development of Da Nang city and meet the need of investment in building the Da Nang University (400 ha), the concentrated industrial zone of Dien Nam - Dien Ngoc (420 ha) and the Tourism, Recreation and Vacation areas (more than 300 ha) on the basis of making use of the strengths in natural conditions, landscapes and climate of the area to form in this area an industrial, service, educational, training, tourist and vacation center of Quang Nam and the Central Vietnam region as a whole.

2. Scope of general planning:

The land area selected for urban development lies in the Da Nang - Hoi An plain with an exploitable acreage of about 2,700 ha forming part of the land areas of the three communes of Dien Nam, Dien Ngoc and Dien Duong with the following boundaries:

- To the North bordering on Da Nang city (Non Nuoc - Hoa Quy - Hoa Hai area);

- To the South bordering on the outlying area of Hoi An town (Cam An and Cam Ha communes);

- To the East bordering on the East Sea;

- To the West bordering on the Da Nang - Hoi An road;

The direction for the new urban development is: to the North up to the boundary of Da Nang city, to the South up to the suburb of Hoi An town, to the East hugging the section of Co Co river up to the coast, and to the West up to the inter-provincial road between Da Nang city and Hoi An town.

3. Population size:

Up to 2020 the population of the new urban center of Dien Nam - Dien Ngoc is planned at around 150,000, about 50,000 for the first phase up to 2005.

4. Plan for the use of land and urban landscape architectures:

a/ On the index of land use:

The average urban land use index is 80m2/person, of which land for communication is 23m2/person, land for trees, physical culture and sports is 12m2/person and land for public utility works is 5m2/person.

b/ On the disposition of specialized areas:

- The concentrated industrial zone of Dien Nam - Dien Ngoc with a projected acreage of 420 ha shall be located west of the urban area near the Da Nang - Hoi An trunk road.

- The population area with a total acreage of about 680 ha shall comprise 150 ha associated with the industrial zone, 300 ha associated with the university area and 230 ha conserved as the Dien Duong communal area of agriculture and fishery.

- The public center system: The main center of the urban area shall have a projected acreage of 50 ha to be located beside the trunk road bound for the sea. The population center with a projected area of 20 ha shall be located in three areas: Dien Nam, Dien Ngoc and Dien Duong. The specialized areas shall comprise: the university training area including the Da Nang University, the Quang Nam people-funded university with a projected area of 400 ha located in the North of the urban area; the tourist center and golf course with a projected land area of 300 ha located on either bank of Co Co river along the sea coast; the sand dune area of Dien Duong commune including the medical, treatment and convalescent establishments.

- The tree-and-water and physical culture and sport area: covering 150 ha tree lines and park area along Co Co river, 30 ha for trees in residential areas, along the streets and the fir tree forests and sand dunes along the coast.

The reserve development area of about 300 ha to be located south of the industrial area adjacent to the suburb of Hoi An town.

c/ On the architecture and landscape of the urban area:

- The urban space shall include two areas: the modern construction area comprising many high-rises adjacent to the external-oriented communication lines west of the urban center, the industrial zone and the training area; the ecological urban area lies chiefly to the East of the urban center comprising the central area, the parks and the tourist area to be constructed with low and scattered buildings. The urban space shall be lower toward the sea and the South;

- To make navigable the section of Co Co river from Cua Dai (Hoi An) to Non Nuoc and the Han river (Da Nang) to serve as the principal space axis of the urban center, creating a water surface area, a tree-lined corridor and the landscape and vacationing areas for the urban center;

- To maintain for long preservation the villages and hamlets of the agricultural and fishery population area of Dien Duong, and to transform them into ecological villages adjacent to the old villages on the outskirts of Hoi An.

5. On transport and infrastructure planning:

a/ On transport:

- External oriented transport comprises the provincial roads linking with National Highway 1A, Da Nang city, Hoi An town and Vinh Dien township; to dredge and clear the Co Co river in order to organize a tourist river way. To use the Da Nang international airport and the Chu Lai airport to cater for the urban area.

- The inner town transport system shall comprise the urban trunk road with a roadbed width of 34-50 m, the area trunk road with a roadbed width of 31 m, the area road with a roadbed width of 22.5m and the residential area road with a roadbed width of 19.5m to be planned proportionately with the terrain and natural water course with an area of 270 ha (including static communication). The inter-provincial bus station shall be located to the West of the urban center near the Dien Ngoc crossroads with a projected area of 2.5 ha.

b/ On preparations of land technique:

- Ground leveling:

The land area for urban construction planning shall have a terrain height of from +4.0 to +7.0, which requires not too much ground leveling but only partial leveling in each area. The limit height for the specialized areas is +2.5 to +4.0.

- Rain water drainage:

To install separate rain water drainage and waste water drainage. Rain water shall be drained in two directions: East of the industrial area it shall be drained to Co Co river, and west of the industrial area to Vinh Dien river.

c/ On water supply:

- Water for daily life:

By 2005: 100 liters/person/day

By 2020: 130 liters/person/day

- Industrial water: to be determined according to the industrial project.

Water of other types: to be supplied according to norms.

- Rate of water supply per population:

80% of the population by 2005;

85% of the population by 2020;

- Capacity of water plants:

35,000 m3/day by 2005

85,000 m3/day by 2020;

- Water sources: In the first phase water shall be taken from on-the-spot surface water sources of the Vinh Dien river system.

- Water supply network: A pumping station with capacity of 85,000 m3/day shall be installed at the intersection of Vinh Dien and Thanh Quyt rivers, a water processing plant with the same capacity shall be installed at the beginning of the network near the industrial zone and near the Da Nang - Hoi An trunk road with an acreage of about 4-5 ha. The pipeline shall have a diameter of f700 and the system of distribution pipelines shall have a diameter of from f100 to f700.

d/ On electricity supply:

- The civil load shall be 53,332 KW (6,000 KW for the first phase) and electric capacity of the industrial load shall be 120,000 KW (69,207 KW for the first phase). The total load shall be 173,332 KW;

- Electric source: from 220/110 KV stations - 2 x 250 MVA at Cau Do;

- Electric grid includes: Grid 110 KV from 220/110 KV station at Cau Do, to stretch a double line cable of 110 KV reaching 110/22 KV of the new urban center (including stations in both the North and the South); grid 22KV and grid 0.4 KV designed according to the close circuit underground cable.

e/ On water drainage and environmental sanitation:

- The whole industrial waste water and civilian waste water must be treated before being discharged into the rivers;

- Average discharge of waste water is projected at 120 liters/person/day, total discharge is 14,500 m3/day.

- To build separate systems of sewers, 12 pumping stations and 2 concentrated water treatment stations. Waste water after treatment at the Northwest station shall be discharged into Vinh Dien river, at the South-West station shall be discharged into Co Lu stream and into Thu Bon river;

- Living and industrial garbage shall be buried with the prescribed technique (to be treated in the long run) at the 20 ha dumping ground on the hills of Dai Hiep commune, Dai Loc district.

- The cemetery is projected to be built on the hills in Dai Phuoc commune, Dai Loc district, about 20 km from the town center on the road to the Central Highlands on an acreage of 40 ha. In the coming years the remaining land at the cemetery in the South of the town shall continue to be used as burial ground.

6. Planning for first phase construction:

In order to achieve the goal of forming an urban population center in the first period and at the same time to develop the infrastructure to meet the need of the activities of the Dien Nam - Dien Ngoc industrial zone and the university training area, priority of designing and implementation should be concentrated on the following projects of investment in transformation and construction:

- The project of investment in building the infrastructure of the industrial zone and the university training area;

- The project of building the civilian area of the new urban center comprising administrative works, public welfare works such as culture, education, public health for the people in the urban center, workers of the industrial zone and officials and public employees and students of the university training area.

- The projects of residential apartment buildings and low houses on a total acreage of 150 ha.

- The project of building the main transport road in the urban center covering 80 ha, first of all the roads linked to the industrial zone, the university training area and the urban population area;

- The project of building the water supply system, electric supply system, the communications system, rain water drainage and waste water discharge system for the industrial zone, the university training area and the urban residential area.

Article 2.- The Peoples Committee of Quang Nam province shall coordinate with the Ministry of Construction and the related ministries and branches in organizing the implementation of the general planning for the new Dien Nam - Dien Ngoc urban center:

1. To ratify the designing dossier of the general planning for the new Dien Nam - Dien Ngoc urban center up to 2020 after reaching agreement with the Ministry of Construction;

2. To organize the publicization of the general planning for the new Dien Nam - Dien Ngoc urban center up to 2020 so that the people may know, inspect and implement; to organize the elaboration and implementation of the detailed planning of the specialized areas in the urban center and the projects of investment as currently prescribed with a view to drawing up the annual and long-term plans for the realization of the common planning;

3. To issue the Regulation on management of architecture and the planning of construction of the new Dien Nam - Dien Ngoc urban center after reaching agreement with the Ministry of Construction;

4. To mobilize the funding sources in the country and abroad in various forms to carry out the investment projects for the construction of the new Dien Nam - Dien Ngoc urban center.

Article 3.- This Decision takes effect 15 days after its signing.

The President of the Peoples Committee of Quang Nam province, the Ministers of Construction, Defense, Planning and Investment, Agriculture and Rural Development, Finance, Communications and Transport, Industry, Science, Technology and Environment, Education and Training and the General Director of the General Land Administration shall have to implement this Decision.

THE PRIME MINISTER OF GOVERNMENT




Ngo Xuan Loc

Đã xem:

Đánh giá:  
 

Thuộc tính Văn bản pháp luật 124/1999/QD-TTg

Loại văn bảnQuyết định
Số hiệu124/1999/QD-TTg
Cơ quan ban hành
Người ký
Ngày ban hành18/05/1999
Ngày hiệu lực02/06/1999
Ngày công báo...
Số công báo
Lĩnh vựcXây dựng - Đô thị
Tình trạng hiệu lựcCòn hiệu lực
Cập nhật16 năm trước
Yêu cầu cập nhật văn bản này

Download Văn bản pháp luật 124/1999/QD-TTg

Lược đồ Decision No. 124/1999/QD-TTg of May 18, 1999, ratifying the general planning for the new Dien Nam - Dien Ngoc urban center in Quang Nam province


Văn bản bị sửa đổi, bổ sung

    Văn bản sửa đổi, bổ sung

      Văn bản bị đính chính

        Văn bản được hướng dẫn

          Văn bản đính chính

            Văn bản bị thay thế

              Văn bản hiện thời

              Decision No. 124/1999/QD-TTg of May 18, 1999, ratifying the general planning for the new Dien Nam - Dien Ngoc urban center in Quang Nam province
              Loại văn bảnQuyết định
              Số hiệu124/1999/QD-TTg
              Cơ quan ban hànhThủ tướng Chính phủ
              Người kýNgô Xuân Lộc
              Ngày ban hành18/05/1999
              Ngày hiệu lực02/06/1999
              Ngày công báo...
              Số công báo
              Lĩnh vựcXây dựng - Đô thị
              Tình trạng hiệu lựcCòn hiệu lực
              Cập nhật16 năm trước

              Văn bản thay thế

                Văn bản được dẫn chiếu

                  Văn bản hướng dẫn

                    Văn bản được hợp nhất

                      Văn bản gốc Decision No. 124/1999/QD-TTg of May 18, 1999, ratifying the general planning for the new Dien Nam - Dien Ngoc urban center in Quang Nam province

                      Lịch sử hiệu lực Decision No. 124/1999/QD-TTg of May 18, 1999, ratifying the general planning for the new Dien Nam - Dien Ngoc urban center in Quang Nam province

                      • 18/05/1999

                        Văn bản được ban hành

                        Trạng thái: Chưa có hiệu lực

                      • 02/06/1999

                        Văn bản có hiệu lực

                        Trạng thái: Có hiệu lực