Dispatch No. 138/TTg-KTN dated January 16, 2013, Master plan for Vietnam’s liquefied natural gas-based projects issued by the Prime Minister of Government

Nội dung toàn văn Dispatch 138/TTg-KTN Vietnam’s liquefied natural gas based projects


THE PRIME MINISTER
-------

THE SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
---------

No.:138/TTg-KTN
Rep: Master plan for Vietnam’s liquefied natural gas-based projects

Hanoi, January 16, 2013

 

To:

- The Ministry of Industry and Trade and Ministry of Transport;
- The people’s Committee of Binh Thuan
- Vietnam Oil and Gas Group and Vietnam Electricity.

 

In consideration of requests of the Ministry of Industry and Trade in the Official Dispatch No.5265/TTr-BCT dated June 18, 2012 and consensus on the master plan for liquefied natural gas –based projects in Vietnam (hereinafter referred to as “LNG”) at the meeting held on January 04, 2013 (having attendance of heads of the Ministry of Industry and Trade, Ministry of Finance, Ministry of Planning and Investment, Ministry of Natural Resources and Environment, People’s Committee of Binh Thuan, Vietnam Oil and Gas Group, Vietnam Electricity and Deputy Prime Ministers), the Prime Minister hereby:

1. Agrees to ratify the policy on development of a chain of LNG-based electricity-gas projects in Son My, Binh Thuan province which includes:

- Son My LNG warehouse and port project with the capacity of 6 million tonnes/year, divided into 02 construction phases (phase 1: it is expected to come into operation in 2019 – 2020 with the capacity of 3.6 million tonnes/year; phase 2: it is expected to come into operation after 2020 (2023)). It is designed to increase the capacity up to 10 million tonnes/year after 2025.

- Son My Power Center project including Son My I power plant with the capacity 2,000 MW expected to come into operation in 2019 and Son My II power plant with the capacity of 2,000MW expected to come into operation in 2020.

- Power transmission project (connecting Son My Power Center to the national electrical grid) including 01 double-circuit 500 kV transmission line to Dong Nai and 03 double circuit 200kV transmission lines to Phan Thiet and Ba Ria – Vung Tau (specified as the Son My Power Center project is approved).

- Son My – Phu My pipeline project with maximum capacity of 8 billion m3/year expected to come into operation in after 2020 (2023).

2. Implementation:

a) The Ministry of Industry and Trade shall:

- Ratify the project.

- Cooperate with relevant regulatory authorities in instructions on execution of the chain of Son My LNG-based gas-electricity projects according to the set forth schedule and regulations and ensuring synchronous and effective execution.

- Take charge of and cooperate with relevant authorities in implementation of the procedure for adding electricity projects of the above-mentioned chain of projects to the National electricity development planning 2011-2020 and orientations towards 2030 and submit it to the Prime Minister for approval.

- Take charge of and cooperate with relevant authorities in study and submission of necessary policies on specific projects of the chain of projects to the Prime Minister.

- Take charge of and cooperate with relevant regulatory authorities to request the Prime Minister to assign duties or competent authorities to introduce legislative documents, national technical regulations and standards to ensure all items of the chain of projects are under strict and effective management. Submit reports to the Prime Minister within the first quarter of 2013;

b) The Ministry of Transport shall take charge of and cooperate with relevant regulatory authorities in conduct of the procedure for adding Son My oil and gas specialized ports (serving purposes of importing LNG, etc.) to the master plan for Vietnam’s seaport system development by 2020 and orientations towards 2030 and submit it to the Prime Minister for approval.

c) The People’s Committee of Binh Thuan and Ba Ria-Vung Tau shall take charge of and cooperate with relevant regulatory authorities in submission of request for approval for the planning or adjustments to planning (including land-use planning) related to projects of the Scheme for LNG –based projects in Son My to the competent authority; support investors during preparation and investment in projects within the province.

d) The Vietnam Electricity shall take charge of preparing projects for investment in electrical grids in synchronization with the Son My power Center.

dd) Vietnam National Oil and Gas Group shall take charge of preparing:

- LNG warehouse and import project in Son My, Binh Thuan province;

- Son My – Phu My Pipeline Project. /.

 

 

 

PP.
PRIME MINISTER
DEPUTY PRIME MINISTER




Hoang Trung Hai

 


------------------------------------------------------------------------------------------------------
This translation is made by LawSoft and for reference purposes only. Its copyright is owned by LawSoft and protected under Clause 2, Article 14 of the Law on Intellectual Property.Your comments are always welcomed

Đã xem:

Đánh giá:  
 

Thuộc tính Công văn 138/TTg-KTN

Loại văn bản Công văn
Số hiệu 138/TTg-KTN
Cơ quan ban hành
Người ký
Ngày ban hành 16/01/2013
Ngày hiệu lực 16/01/2013
Ngày công báo ...
Số công báo
Lĩnh vực Đầu tư, Tài nguyên - Môi trường
Tình trạng hiệu lực Không xác định
Cập nhật 13 năm trước
Yêu cầu cập nhật văn bản này

Download Công văn 138/TTg-KTN

Lược đồ Dispatch 138/TTg-KTN Vietnam’s liquefied natural gas based projects


Văn bản bị sửa đổi, bổ sung

Văn bản sửa đổi, bổ sung

Văn bản bị đính chính

Văn bản được hướng dẫn

Văn bản đính chính

Văn bản bị thay thế

Văn bản hiện thời

Dispatch 138/TTg-KTN Vietnam’s liquefied natural gas based projects
Loại văn bản Công văn
Số hiệu 138/TTg-KTN
Cơ quan ban hành Thủ tướng Chính phủ
Người ký Hoàng Trung Hải
Ngày ban hành 16/01/2013
Ngày hiệu lực 16/01/2013
Ngày công báo ...
Số công báo
Lĩnh vực Đầu tư, Tài nguyên - Môi trường
Tình trạng hiệu lực Không xác định
Cập nhật 13 năm trước

Văn bản thay thế

Văn bản được dẫn chiếu

Văn bản hướng dẫn

Văn bản được hợp nhất

Văn bản được căn cứ

Văn bản hợp nhất

Văn bản gốc Dispatch 138/TTg-KTN Vietnam’s liquefied natural gas based projects

Lịch sử hiệu lực Dispatch 138/TTg-KTN Vietnam’s liquefied natural gas based projects

  • 16/01/2013

    Văn bản được ban hành

    Trạng thái: Chưa có hiệu lực

  • 16/01/2013

    Văn bản có hiệu lực

    Trạng thái: Có hiệu lực