Nghị quyết 41/2009/QH12

Resolution No. 41/2009/QH12 of November 25, 2009, approving investment in Ninh Thuan nuclear power project

Nội dung toàn văn Resolution No. 41/2009/QH12 of November 25, 2009, approving investment in Ninh Thuan nuclear power project


THE NATIONAL ASSEMBLY
-------

SOCIALIST REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
----------

No. 41/2009/QH12

Hanoi, November 25, 2009

 

RESOLUTION

APPROVING INVESTMENT IN NINH THUAN NUCLEAR POWER PROJECT

THE NATIONAL ASSEMBLY OF THE SOCIALIST REPUBLIC OF VIETNAM

Pursuant to the 1992 Constitution of the Socialist Republic of Vietnam, which was amended and supplemented under Resolution No. 51/2001/QH10;
Pursuant to Resolution No. 66/2006/QH11 of June 29, 2006, of the XIth National Assembly, the 9th session, on important national projects and works to be submitted to the National Assembly for investment approval;
Pursuant to the June 3, 2008 Law on Atomic Energy;
After considering the Government's Report No. 08/TTr-CP of September 30, 2009; Verification Report No. 739/BC- UBKHCNMT12 of October 20, 2009, of the National Assembly's Committee on Science, Technology and Environment; the Government's Additional Report No. 15/TTr-CP of October23,2009; other Government reports on the proposal on investment in Ninh Thuan Nuclear Power Project, and opinions of National Assembly deputies;

RESOLVES:

Article 1.

To approve investment in Ninh Thuan Nuclear Power Project, including two plants each having two engine groups, to supply electricity for the national power grid, contributing to the socio-economic development of the country and Ninh Thuan province.

The site of construction: Ninh Thuan nuclear power plant 1 will be located in Phuoc Dinh commune. Thuan Nam district. Ninh Thuan province; and Ninh Thuan nuclear power plant 2 in Vinh Hai commune, Ninh Hai district, Ninh Thuan province.

Article 2.

Below are several basic parameters of the Project:

1. The Project's scope: The capacity of two plants will be over 4.000 megawatts (MW) suitable to the selected technology and furnace generation, with the capacity of Ninh Thuan nuclear power plant 1 to be about 2,000 MW and that of Ninh Thuan nuclear power plant 2 to be about 2,000 MW;

2. Main technology: Light water reactors of the most modern generation, already checked, to ensure absolute safety and economic efficiency at the time of formulation of the investment project;

3. Construction land area: To use land in the most appropriate and thrifty manner;

4. Total investment: estimated at VND 200 trillion (at the time of formulation of the Project in the 4'" quarter of 2008);

5. Implementation time and roadmap:

- To commence construction of Ninh Thuan nuclear power plant 1 by 2014. and put the first engine group into operation by 2020.

- Based on the preparation situation, the Government shall report to the National Assembly for decision on the time to commence construction of Ninh Thuan nuclear power plant 2.

Article 3.

To assign the Government to decide on the project investment and implementation to meet the following major requirements and tasks:

1. To promptly finalize and approve master plans and fully and comprehensively promulgate legal documents and technical standards and regulations on construction, management, operation and exploitation of nuclear power plants;

2. To calculate work designs according to special standards, ensuring the highest security and safety. To study and fully assess impacts of geological formation faults and phenomena of climate change and sea level rise in the project implementation area; to elaborate and approve the Project's environmental impact assessment report according to regulations;

3. To elaborate detailed plans for the relocation and resettlement of local inhabitants and properly organize the implementation thereof, and construct infrastructure facilities serving the Project, ground area and auxiliary structures serving the construction of the plants;

4. To adopt policies prioritizing the construction of infrastructure facilities for developing economic, cultural, educational and social welfare activities in the areas of the plants under Article 5 of the Law on Atomic Energy;

5. To select highly experienced contractors for the designing, creation, construction and operation of nuclear power plants from countries with high scientific and technological potential in this field that have implemented many nuclear power plant projects, are financially viable and have reasonable investment ratios. To make a plan on incrementally increasing localization rates in construction and equipment manufacture;

6. To expeditiously implement plans on training of human resources in the field of atomic energy and nuclear power for the construction with quality and operation of the nuclear power plants, examining, supervising and assessing safety in the process of constructing, operating and exploiting these plants;

7. To study and assess natural resources and deposit of uranium, and the capability of exploiting, processing and domestic need for using uranium for a long time;

8. To prepare master plans on land use to meet requirements of building a site for safely treating nuclear waste;

9. To properly carry out information work and mobilization of the people through various specific forms, creating high consensus in society.

Article 4.

The Government shall study and formulate special mechanisms and policies permitting investors to accumulate capital and banks to provide credit; and those on compensation and support of resettlement; construction of socio­economic infrastructure, organization of production and stabilization of the life of local inhabitants in the area to be affected by the construction of the plant, and submit them to the National Assembly for consideration and decision.

Article 5.

1. Before commencing construction of the first engine group, the Government shall report on preparation results to the National Assembly.

2. After commencing investment in the Project, annually the Government shall report on the implementation of the Project to the National Assembly.

3. The National Assembly Standing Committee, the Ethnic Council, the Committees of the National Assembly, delegations of National Assembly deputies and individual National Assembly deputies shall, within the ambit of their respective tasks and powers, oversee the implementation of this Resolution.

This Resolution takes effect on the date of its adoption by the National Assembly.

This Resolution was adopted on November 25, 2009, by the XIth National Assembly of the Socialist Republic of Vietnam at its 6th session.-

 

 

CHAIRMAN OF THE NATIONAL ASSEMBLY




Nguyen Phu Trong

 

Đã xem:

Đánh giá:  
 

Thuộc tính Văn bản pháp luật 41/2009/QH12

Loại văn bảnNghị quyết
Số hiệu41/2009/QH12
Cơ quan ban hành
Người ký
Ngày ban hành25/11/2009
Ngày hiệu lực25/11/2009
Ngày công báo...
Số công báo
Lĩnh vựcĐầu tư
Tình trạng hiệu lựcHết hiệu lực 22/11/2016
Cập nhật14 năm trước
Yêu cầu cập nhật văn bản này

Download Văn bản pháp luật 41/2009/QH12

Lược đồ Resolution No. 41/2009/QH12 of November 25, 2009, approving investment in Ninh Thuan nuclear power project


Văn bản bị sửa đổi, bổ sung

    Văn bản sửa đổi, bổ sung

      Văn bản bị đính chính

        Văn bản được hướng dẫn

          Văn bản đính chính

            Văn bản bị thay thế

              Văn bản hiện thời

              Resolution No. 41/2009/QH12 of November 25, 2009, approving investment in Ninh Thuan nuclear power project
              Loại văn bảnNghị quyết
              Số hiệu41/2009/QH12
              Cơ quan ban hànhQuốc hội
              Người kýNguyễn Phú Trọng
              Ngày ban hành25/11/2009
              Ngày hiệu lực25/11/2009
              Ngày công báo...
              Số công báo
              Lĩnh vựcĐầu tư
              Tình trạng hiệu lựcHết hiệu lực 22/11/2016
              Cập nhật14 năm trước

              Văn bản thay thế

                Văn bản được dẫn chiếu

                  Văn bản hướng dẫn

                    Văn bản được hợp nhất

                      Văn bản gốc Resolution No. 41/2009/QH12 of November 25, 2009, approving investment in Ninh Thuan nuclear power project

                      Lịch sử hiệu lực Resolution No. 41/2009/QH12 of November 25, 2009, approving investment in Ninh Thuan nuclear power project

                      • 25/11/2009

                        Văn bản được ban hành

                        Trạng thái: Chưa có hiệu lực

                      • 25/11/2009

                        Văn bản có hiệu lực

                        Trạng thái: Có hiệu lực