Quyết định 1401/QD-BGTVT

Decision No. 1401/QD-BGTVT dated 26 May 2010, approval of the detailed planning of Nghi Son – Thanh Hoa seaport till 2020, orientating till 2030

Nội dung toàn văn Decision No. 1401/QD-BGTVT 2010 approval of the detailed planning of Nghi Son Thanh Hoa seaport


MINISTRY OF TRANSPORT
-------

SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
---------------

No.: 1401/QD-BGTVT

Ha Noi, 26 May 2010

 

DECISION

APPROVAL OF THE DETAILED PLANNING OF NGHI SON – THANH HOA SEAPORT TILL 2020, ORIENTATING TILL 2030

THE MINISTER OF TRANSPORT

Pursuant to Construction Law dated 26 November 2003;

Pursuant to Maritime Code of Vietnam dated 14 June 2005;

Pursuant to governmental Decree No. 51/2008/ND-CP dated 22 April 2008 stipulating the functions, duties, empowerment and organizational structure of the Ministry of Transport;

Pursuant to governmental Decree No. 92/2006/ND-CP dated 7 September 2006 regarding the preparation, appraisal, approval and management of the master socio-economic development planning and Decree No. 04/2008/ ND-CP dated 11 January 2008 amending and supplementing a number of articles defined in Decree 92/2006/ ND-CP;

Pursuant to Decision No. 2190/QD-TTg dated 24 December 2009 approving the Planning on Vietnam’s seaport system development till 2020, orientating till 2030;

Pursuant to Decision No. 16/2008/QD-TTg dated 28 January 2008 issued by the Prime Minister proclaiming the list of Vietnam seaport categories;

Pursuant to Decision No. 1364/QD-TTg dated 10 October 2007 issued by the Prime Minister approving the General Planning of Nghi Son Economic Zone construction, Thanh Hoa Province;

Pursuant to Decision No. 2619/QD-BGTVT dated 8 September 2002 issued by the Minister of Transport approving the detailed planning of North Central seaports (group 2) till 2010;

Pursuant to Decision No. 2249/QD-BGTVT dated 31 July 2008 issued by the Minister of Transport approving the detailed planning of Nghi Son Seaport, Southern Bay area, Bien Son – Thanh Hoa island, till 2015, orientating till 2025;

Based on official document No. 106/TTr-UBND dated 15 December 2009 issued by the People’s Committee of Thanh Hoa Province approving the detailed planning of Nghi Son – Thanh Hoa Seaport in attachment with the planning document; report from the consulting agency who inspects and appraises the planning, opinions from the related agencies; official document No. 2196/UBND-CN dated 10 May 2010 of Thanh Hoa People’s Committee attached with document 491/BQLKTNS-QLXD dated 5 May 2010 from the Management Unit of Nghi Son Economic Zone regarding the explanation and clarification of the planning appraisal opinions and opinions from the related agencies;

In consideration of the requests from the Director General of the Planning and Investment Department;

HEREBY DECIDES:

Article 1.  The approved detailed planning of Nghi Son Seaport till 2020, orientating till 2030, covers the following key issues:

 (Attached with the site planning drawing and detailed appendix.)

1. Borderlines of the approved planning

The Northern and Southern Bay areas of Bien Son Island and the development area in Hon Me Island.  Total area of the seaport is 2,020 ha (including land and water area).

- The North: from the breakwater of the export port of Nghi Son Oil Refinery (to be constructed);

- The South: bordering Quynh Luu coastal area, Nghe An Province;

- The East: bordering the East Sea;

- The West: bordering Road 513 of Nghi Son Economic Zone

2. Functions and duties

Nghi Son – Thanh Hoa Seaport is the national multipurpose port, the hub of the area (Type 1), meeting the demands for goods import and export for Nghi Son Economic zone, Thanh Hoa Province and the neighboring areas.  It houses the following  specialized terminals:

To the North of Bien Son Island located the  specialized terminals for receiving 30,000 ÷ 50,000 DWT vessels carrying petrochemical, cement, bulk, liquid commodities.

To the South of Bien Son Island located the multipurpose terminals and container terminals for 30,000 ÷ 50,000 DWT vessels, and specialized terminals.

At Hon Me Island located the terminals serving transshipment, shelter from storms, tourism, and national defense purposes.

3. Planning indicators

3.1. Goods quantity indicators

Unit: 1,000 T

No.

Commodity

2015

2020

2030

1

General goods + container

6,900

9,840

18,000

2

Goods from cement factory(ies)

7,600

10,310

10,310

3

Clinkers

1,500

3,000

3,000

4

Petroleum

19,000

19,000

38,000

5

Coal of thermal power plant(s)

1,000

2,500

5,500

 

Total:

36,000

44,650

74,810

3.2. Fleet-related indicators

- The period till 2020:  receiving the vessels of 30,000 – 50,000 DWT.

- The period till 2030:  receiving the vessels of over 50,000 DWT.

- Hon Me Island transshipment area will receive crude tankers and the plan for receiving imported coal vessels of over 100,000 DWT will be studied.

3.3. Land use demand:

Total planning area is 2,020 ha, of which the land area is 916.8 ha and the water area is 1,103.2 ha (including the area for Nghi Son Oil Refinery terminal).

4. Port site planning

4.1. Functional zoning

The port includes: multipurpose terminal, container terminal, specialized terminals for Nghi Son Economic Zone (export terminals of the Plants on oil refinery, thermal coal, cement, ship building, petroleum import and export…).  Based on the specialized functions, the port will zoned as follows:

4.1.1. The area to the North of Bien Son Island will include:

- Terminal for the exports from the oil refinery plant:  8 specialized terminals for 10,000 – 50,000 DWT vessels, 210 ha in area;

- Specialized terminal for gas and/or LNG vessels, 45 ha  in area, 1,000m  in length;

- Specialized terminal for industrial parks to receive 50,000 DWT vessels, 51.8 ha in area, 1,150m in length;

- The terminal for inbound tourism and logistic services:  33.5 ha

4.1.2. The area to the South of Bien son Island will include:

- Multipurpose terminal:  with 19 piers for 30,000 DWT vessels, 136.1 ha in area, 4,605m in length.  By 2020, 11 terminals will be constructed.

- Container terminal:  with 10 piers for 50,000 DWT vessels, 180.1 ha in area, 2,500m in length; by 2020, 6 terminals will be constructed.

- Terminal for the thermal power Plant:  with 5 piers, of which one for 30,000 DWT vessels; it is likely to consider the visit of 50,000 DWT vessels; remaining piers are for smaller vessels of 5,000 – 7,000 T, 16 ha in area, 560m in length.

4.1.3. Hon Me Island area includes:  Terminal for transshipment for crude tankers (the plan for imported coal vessels will be studied) of over 100,000 DWT; storm shelter area for vessels and/or boat.

4.1.4. Other functional areas include:

- Areas for water, navigation channel and protection structures:  1,103.2 ha (500.8 ha to the South of Bien Son Island, 602.4 ha to the North of Bien Son Island);

- Roads:  50.3 ha (34.7 ha to the South of Bien Son Island and 15.6 ha to the North of Bien Son Island);

- Area for railway development:  33.8 ha;

- Area for the port authority:  5.1 ha;

- Port servicing area:  11.5 ha;

- Parking area:  3.4 ha;

- Logistic service area:  57.9 ha;

- Green area:  50.5 ha (13.7 ha to the South of Bien Son Island and 36.8 ha to the North of Bien Son Island).

4.2. Pier planning

- The area of each pier must be sufficient to facilitate operation, port and general safety for the terminal.

- The port planning area includes the piers completed constructed, under construction and not yet constructed but selected site, therefore, the planning of the piers in the terminals will base on the remaining available area located within the planning area, in line with the master planning and completed projects.  Locations of the piers will be specified by specialized authorities during the planning development.

5. Technical infrastructure system

The technical infrastructure connecting the seaport to the outer transportation infrastructure will be in line with the master planning of the Economic Zone.

5.1. Planning of the road leading to the seaport and internal roads inside the port area

- The road leading to the port:

+ Arterial road to the East – West direction:  connecting the seaport and the central road of the economic zone to Highway 1A and North – South Highway, with 8 lanes, starting from the feeder road at Dong Chua Lake (in the direction of Nghi Son – Bai Tranh route).

+ Road 513 (along the shore):  City road Grade II, with 4 lanes, North – South direction, connecting the port’s functional areas from the Northern to the Southern areas and to Nghi Son oil refinery Industrial Park.  The alignment and dimension of the cross section will be in line with the master planning of Nghi Son Economic Zone and the approved planning of Road 513.

- Inland roads of the seaport:  adjacent to the logistic area of the port, in parallel with the key roads connected to the port, with 2 lanes at least, 20 km/h speed, H30 load.

- Internal roads in the seaport area:  in line with the planning for the loading and unloading technology, ensured to facilitate transportation.

- Railway:  an area of the planning land will be developed into railway; investment location and scale will be in line with the master planning and development demand of Nghi Son Economic Zone.

5.2. Planning of the navigation channel and turn-around area

5.2.1. The Southern area of Bien Son Island:

- Navigation channel:  till 2020, one-lane channel, two-way, 7km in length, 150m wide, capable for 30,000 DWT fully loaded vessels, 50,000 DWT underloaded vessels.

- Vessel turn-around area will include 2 sub-areas, capable for 30,000 – 50,000 DWT vessels.  The turn-around area for 50,000 DWT vessels will be constructed once the breakwater is completed  to serve the demand of the vessels.

5.2.2. The Northern area of Bien Son Island:  Specialized navigation channel and turn-around area for industrial parks will be developed based on the demand and investment capacity of the industrial parks.

5.3. Leveling-related planning

- Elevation of the road and yard system inside the seaport area will be planned based on the highest elevation of the terminals + 5.0 of the Nautical Chart and master planning of the economic zone.

- Filled sand will be exploited from the mines in Nghi Son Economic Zone and some of the dredged sand from the port water area may also be used.

5.4. Power supply planning

- Power supply target applicable to the industrial areas inside the seaport is 150 kW/ha.  Total electricity consumption for the period of 2020 is estimated to be 99,716 KW; and up to 207,184 KW by the completion time.

- The power source to be supplied to the seaport will be taken from the 22KV line of 110/35/22KV-25MVQ stations nearby in the area.

5.5. Planning for water supply and drainage

- Clean water will be conducted from the Water Plant in Dong Rua Lake and Con Cat Lake area and alongside the road connected to the seaport areas.  Diameter of the water pipelines ranges from D150 to D400.

- Total water consumption demand of the entire seaport area is estimated to be:

+ 2020 period:  6,146 m3/day.night

+ Completion stage:  14,790 m3/day.night

- Water drainage system will ensure to meet the drainage demand; wastewater will be treated in accordance with environmental protection regulations.

6. Estimated investment capital based on the planning

No.

Functional area

Estimated investment cost
(VND bl.)

Till 2020

Till 2030

Southern area of Bien Son Island

6,276.65

12,647.12

1

Multipurpose terminal 1

1,038

1,671

2

Multipurpose terminal 2

1,044

2,139

3

Terminal for Nghi Son Thermal Power Plant

480

480

4

Container terminal 1

3,255

3,500

5

Container terminal 2

0

2,796.5

6

Port authority area

510

510

7

Green area

3.65

6.85

8

Logistic service area

0

862.5

9

Square, monument area

0

2,775

10

Railway development area

0

504

11

Roads

126

174.5

Northern area of Bien Sơn Island

5,154.4

11,020.6

12

Specialized terminal

0

1554

13

Terminal for inbound tourism, tourism, logistic services

0

670

14

Gas, LPG area

1,575

1,575

15

Terminal for oil refinery plant

-

-

16

Seaport servicing area

0

115

17

Parking lot

0

10.2

18

Green area

1.4

18.4

19

Roads

78

78

20

Area for navigation channel, breakwater

3,500

7,000

Total:

11,431.05

23,667.72

 (Above costs do not include the investment cost of the terminal for the oil refinery plant and ship building plant)

Article 2. Management and implementation of the planning

1. Related Ministries, People’s Committee of Thanh Hoa Province, Management Unit of Nghi Son Economic Zone are responsible for cooperating, intra vires and depending on their functions and duties, with each other in the management and development of Nghi Son Seaport planning in accordance with the planning objectives, ensuring unity and synchrony with the development of socio-economic development plans of the business sector and local authorities, and in line with the development planning of Vietnam’s seaport system;

- The People’s Committee of Thanh Hoa Province will promptly complete the strategic environmental impact evaluation report  and submit it for approval as regulated.

2. Management on sector-focused planning

- Modification on the supplementation of the terminals will be decided by the Minister of Transport.  Once practical demand requires amendment and/or supplementation to the planning, Thanh Hoa People’s Committee and Vietnam Maritime Administration will present to the Ministry of Transport for consideration intra vires, to meet the socio-economic development demand.

- Vietnam Maritime Administration will be responsible for cooperating with the local functional agencies to manage the maritime planning and develop the approved planning in accordance with the current regulations.

Article 3.  This decision takes effect from the signing date.

This decision is in lieu of Decision No. 2249/QD-BGTVT dated 31 July 2008 issued by the Minister of Transport.

Article 4.  Chief of the Ministry Office, Director General of the Planning and Investment Department, Director of Vietnam Maritime Administration, Chairman of Thanh Hoa People’s Committee, Director of Nghi Son Economic Zone Management Unit and Heads of the related agencies are responsible for implementing this Decision.

 

 

MINISTER




Ho Nghia Dung

 

APPENDICES

PARAMETERS OF THE DETAILED PLANNING OF NGHI SON SEAPORT, THANH HOA
(attached with Decision No. 1401/QD-BGTVT dated 26 May 2010 issued by the Minister of Transport)

APPENDIX 1

TILL 2020

A. LAND AREA OF THE SEAPORT (916.8 ha)

No.

Functional area

Planning parameter

Note

Area

(ha)

No. of terminal

Terminal length

(m)

Terminal elevation

(m)

Vessel tonnage

(DWT)

Capacity
(ml. tonne/year)

I.

Southern seaport area

509.2

18

4,250

-

50,000

22

 

1

Nghi Son Ship Building Plant area

28

-

 

-

-

-

 

2

Multipurpose terminal area

136.1

11

2,750

-12.5

30,000

11

 

 

Existing multipurpose terminal area

9.1

2

435

 

 

 

In operation

Multipurpose terminal 1 area

34.6

5

1,315

 

 

 

 

Multipurpose terminal 2 area

34.8

4

1,000

 

 

 

 

Future development area

57.6

 

 

 

 

 

 

3

Terminal area for thermal power plant

16

1

-

-7.0

30,000

2

 

4

Container terminal 1 area

93

6

1,500

-14.8

50,000

9

 

5

Port authority area

5.1

-

250

-

Tàu công vụ

-

Controlled by the seaport authority

6

Green area

7.3

-

-

-

-

-

 

7

Provisional area for future development

198.5

-

-

-

-

-

8

Area for roads

25.2

-

-

-

-

-

II.

Northern seaport area

407.6

6

-

-

50,000

14

 

1

Terminal area for oil refinery plant

210

6

-

 

50,000

10

 

Export terminal area for LPG plant

-

4

-

-16.0

50,000

-

Export terminal area for solid products

-

2

-

-10.0

10,000

-

2

Terminal area for LPG & LNG plant

45

-

-

-

-

4

 

3

Provisional area for future development

134.2

 

 

 

 

 

 

4

Green area

2.8

-

-

-

-

-

5

Area for roads

15.6

-

-

-

-

-

 

B. WATER AREA OF THE SEAPORT (1,103.2 ha)

No.

Construction structure

Planning parameter

Note

Width

(m)

Length

(m)

Elevation

(m)

I.

Southern seaport area (500.8 ha)

1

Navigation channel area

150

7000

-11,0

 

2

Turn-around area

400 / 560

-

-12,5 / -13,5

3

Breakwater/ sand embankment

-

1200

-

To the East & South

II.

Northern seaport area (602.4 ha)

1

Navigation channel to the oil refinery

160

7000

-

 

2

Navigation channel and turn-around area of the specialized terminal for INDUSTRIAL PARKS

-

-

-

Based on practical development demand

3

Northern breakwater of oil refinery Plant

-

1780

-

 

 

APPENDIX 2

THE PERIOD TILL 2030

A. LAND AREA OF THE SEAPORT (916.8 ha)

No.

Functional area

Planning parameter

Note

Area

(ha)

No. of terminal

Terminal length

(m)

Terminal elevation

(m)

Vessel capacity

(DWT)

Capacity

(ml. tonne/ yr.)

I.

Southern seaport area

509.2

32

-

-

-

39

 

1

Nghi Son Ship Building Plant area

28

-

 

-

-

-

 

2

Multipurpose terminal area

136.1

21

4,605

-12.5

30,000

19

 

 

Existing multipurpose terminal area

9.1

2

435

 

 

 

In operation

Multipurpose terminal 1 area

55.7

9

2,170

 

 

 

 

Multipurpose terminal 2 area

71.3

8

2,000

 

 

 

3

Terminal area for thermal power plant

16

1

-

-7.0 ÷ - 12.5

30,000 - 50,000

5

 

4

Container terminal area

180.1

10

2,500

-14.8

50,000

15

 

 

Container terminal 1 area

100

6

1,500

 

 

 

 

Container terminal 2 area

80.1

4

1,000

 

 

 

 

5

Port authority area

5.1

-

250

-

Service vessel

-

Controlled by the seaport authority

6

Green area

13.7

-

-

-

-

-

 

7

Railway area

33.8

-

-

-

-

-

8

Square, monument area

3.8

-

-

-

-

-

9

Logistic service area

57.9

-

-

-

-

-

10

Area for roads

34.7

-

-

-

-

-

II.

Northern seaport area

407.6

-

-

-

50,000

41

 

1

Northern seaport area

210

8

-

 

50,000

20

 

Terminal area for oil refinery plant

-

6

-

-16.0

50,000

-

Export terminal area for LPG plant

-

2

-

-10.0

10,000

-

2

Export terminal area for solid products

45

-

-

-

-

6

Embankment road of 1,000 m

3

Specialized terminal area for Industrial Parks

51.8

 

 

 

 

 

Embankment road of 1,150m

4

Seaport servicing area

11.5

 

 

 

 

 

 

5

Green area

36.8

 

 

 

 

 

 

6

Terminal area for inbound tourims, port logistic services

33.5

 

 

 

 

 

 

7

Parking area

3.4

-

-

-

-

-

 

8

Area for roads

15.6

-

-

-

-

-

 

B. WATER AREA OF THE SEAPORT (1,103.2 ha)

No.

Construction structure

Planning parameter

Note

Width

(m)

Length

(m)

Elevation

(m)

I.

Southern seaport area (500.8 ha)

1

Navigation channel

300

5,000

-13.5

Based on the port development

2

Turn-around area

400 / 560

-

-12.5 / -13.5

3

Breakwater/ sand embankment

-

2,100

-

 

II.

Northern seaport area (602.4 ha)

1

Inlet navigation channel area for oil refinery plant

160

7,000

-

 

2

Navigation channel area of the specialized terminal for INDUSTRIAL PARKS

300

3,500

-13.5

 

3

Turn-around area

400/560

-

-12.5/-13.5

 

4

Eastern breakwater

-

1,400

-

 

5

Breakwater for petrochemical plant

-

1,780

-

 

 


Đã xem:

Đánh giá:  
 

Thuộc tính Văn bản pháp luật 1401/QD-BGTVT

Loại văn bảnQuyết định
Số hiệu1401/QD-BGTVT
Cơ quan ban hành
Người ký
Ngày ban hành26/05/2010
Ngày hiệu lực26/05/2010
Ngày công báo...
Số công báo
Lĩnh vựcGiao thông - Vận tải, Xây dựng - Đô thị
Tình trạng hiệu lựcCòn hiệu lực
Cập nhật14 năm trước
Yêu cầu cập nhật văn bản này

Download Văn bản pháp luật 1401/QD-BGTVT

Lược đồ Decision No. 1401/QD-BGTVT 2010 approval of the detailed planning of Nghi Son Thanh Hoa seaport


Văn bản bị sửa đổi, bổ sung

    Văn bản sửa đổi, bổ sung

      Văn bản bị đính chính

        Văn bản được hướng dẫn

          Văn bản đính chính

            Văn bản bị thay thế

              Văn bản hiện thời

              Decision No. 1401/QD-BGTVT 2010 approval of the detailed planning of Nghi Son Thanh Hoa seaport
              Loại văn bảnQuyết định
              Số hiệu1401/QD-BGTVT
              Cơ quan ban hànhBộ Giao thông vận tải
              Người kýHồ Nghĩa Dũng
              Ngày ban hành26/05/2010
              Ngày hiệu lực26/05/2010
              Ngày công báo...
              Số công báo
              Lĩnh vựcGiao thông - Vận tải, Xây dựng - Đô thị
              Tình trạng hiệu lựcCòn hiệu lực
              Cập nhật14 năm trước

              Văn bản thay thế

                Văn bản được dẫn chiếu

                  Văn bản hướng dẫn

                    Văn bản được hợp nhất

                      Văn bản gốc Decision No. 1401/QD-BGTVT 2010 approval of the detailed planning of Nghi Son Thanh Hoa seaport

                      Lịch sử hiệu lực Decision No. 1401/QD-BGTVT 2010 approval of the detailed planning of Nghi Son Thanh Hoa seaport

                      • 26/05/2010

                        Văn bản được ban hành

                        Trạng thái: Chưa có hiệu lực

                      • 26/05/2010

                        Văn bản có hiệu lực

                        Trạng thái: Có hiệu lực